'''Preparation of parts for ECAL modules''' -- Sasha  
 
'''Preparation of parts for ECAL modules''' -- Sasha  
 
** Crystals:  
 
** Crystals:  
**: Received 50 crystals from CRYTUR [https://halldweb.jlab.org/wiki/index.php/CRYTUR ]. Remaining 45 crystals are expected to be delivered to the Lab in May/June.
+
**: Received 60 crystals from CRYTUR [https://halldweb.jlab.org/wiki/index.php/CRYTUR ]. Remaining 35 crystals are expected to be delivered to the Lab in May/June.
 
**: Wrapped crystals during last week: 16  
 
**: Wrapped crystals during last week: 16  
 
**: Available for wrapping: 10 CRYTUR
 
**: Available for wrapping: 10 CRYTUR
** Received 725 long signal cables
+
** Received 875 long signal cables
 
** Procurement parts for the LMS:
 
** Procurement parts for the LMS:
 
**: 16,400 ft of optical fibers delivered to the lab. 7,600 will be delivered in September.
 
**: 16,400 ft of optical fibers delivered to the lab. 7,600 will be delivered in September.
Line 20: Line 20:
 
** [https://docs.google.com/presentation/d/1euIA49SszoQmSM4Lxu1OtZ8OfjltgwzXIbXo6TPEB3s/edit#slide=id.p Report from students]
 
** [https://docs.google.com/presentation/d/1euIA49SszoQmSM4Lxu1OtZ8OfjltgwzXIbXo6TPEB3s/edit#slide=id.p Report from students]
 
* '''Visual inspections of fabricated modules [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/19_05_2023/modules_qa.docx] '''  
 
* '''Visual inspections of fabricated modules [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/19_05_2023/modules_qa.docx] '''  
*:  -715 modules have been checked (273 SICCAS + 442 CRYTUR)  [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/19_05_2023/modules_shelves.jpg]
+
*:  -1058 modules have been checked (273 SICCAS + 785 CRYTUR)  [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/19_05_2023/modules_shelves.jpg]
 
* '''Testing and labeling cables'''
 
* '''Testing and labeling cables'''
 
** [https://halldweb.jlab.org/wiki/index.php/Testing_labeling_cables Cable tester and label maker]
 
** [https://halldweb.jlab.org/wiki/index.php/Testing_labeling_cables Cable tester and label maker]

Revision as of 09:24, 2 June 2023

Meeting time and location:

Agenda

Preparation of parts for ECAL modules -- Sasha

    • Crystals:
      Received 60 crystals from CRYTUR [1]. Remaining 35 crystals are expected to be delivered to the Lab in May/June.
      Wrapped crystals during last week: 16
      Available for wrapping: 10 CRYTUR
    • Received 875 long signal cables
    • Procurement parts for the LMS:
      16,400 ft of optical fibers delivered to the lab. 7,600 will be delivered in September.
      Expect to receive all plastic caps for the LMS during next week
  • Module fabrication -- Sasha
  • Visual inspections of fabricated modules [2]
    -1058 modules have been checked (273 SICCAS + 785 CRYTUR) [3]
  • Testing and labeling cables
  • Removing signal cables from the FCAL [5]
  • Testing of PMT dividers -- Sasha / Vlad
    • Most parts for the active base have been arrived to the lab (including PCBs)
    • All dividers will be ordered during next week (by Chris S.)
  • Installation of the FCAL2 detector & integration to GlueX -- Sasha / Arshak
Discussion of the FCAL2 installation procedures [7]