Difference between revisions of "JEF meeting, June 10, 2022"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 8: Line 8:
 
* Preparation of parts for FCAL2 modules -- Sasha
 
* Preparation of parts for FCAL2 modules -- Sasha
 
**Moving crystals from JLab's pool to the Lab [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_10_22/moving_crystals.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_10_22/moving_crystals1.jpg] Moved 335 CRYTUR crystals (need 550).
 
**Moving crystals from JLab's pool to the Lab [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_10_22/moving_crystals.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_10_22/moving_crystals1.jpg] Moved 335 CRYTUR crystals (need 550).
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf Preparation of parts][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_10_22/wrapping.jpg]
+
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf Preparation of parts][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_10_22/wrapping.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_10_22/cutting.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_10_22/cutting1.jpg]
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals]
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals]
 
**Students reports
 
**Students reports

Revision as of 09:05, 10 June 2022

meeting time and location

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda