Difference between revisions of "JEF meeting, July 15, 2022"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 9: Line 9:
 
*** Preshaping ESR foils (with the DSG)
 
*** Preshaping ESR foils (with the DSG)
 
*** Wrapping crystals (with the DSG)
 
*** Wrapping crystals (with the DSG)
 +
*** Preparing Silicon cookies
 
*** Module fabrication
 
*** Module fabrication
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals:] 600 (60 + 185 + 166 + 80 + 68)
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals:] 600 (60 + 185 + 166 + 80 + 68)

Revision as of 08:50, 15 July 2022

Meeting time and location=

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda