*'''Preparation of parts for FCAL2 modules''' -- Sasha  
 
*'''Preparation of parts for FCAL2 modules''' -- Sasha  
* '''Module fabrication'''  -- Sasha** Install  
+
** Received all 150 CRYTUR crystals from physics division (22-C0275) [https://halldweb.jlab.org/wiki/index.php/CRYTUR ]
 +
*** Expect to receive 95 more CRYTUR crystals in May (835 + 95 = 930 in total)
 +
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: 835 (ALL available CRYTUR) ]
 +
*** 10 crystals wrapped since last meeting
 +
*** Available for wrapping: 10 CRYTUR crystals, 140 SICCAS crystals from CCAL
 +
*** Mindy (DSG group) continues wrapping crystals and soldering wires to sockets
 +
**  Disassembling CCAL
 +
*** CCAL moved to the ESB
 +
*** [[All modules (with SICCAS crystals) are removed]]
 +
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf List of available parts]
 +
* '''Module fabrication'''  -- Sasha
 +
<!-- ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf  Status of fabrication ] -->
 +
** Fabricated modules: <span style="color:#FF0000"> Total 1408 </span> (12 modules fabricated since last week)
 +
*** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf All SICCAS 576 SICCAS]
 +
*** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 832 CRYTUR], available: 3
 +
*** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/11_11_22 Moving modules to the new lab (EEL108)]
 +
* '''[[Testing of PMT dividers]]''' -- Sasha / Arshak
 +
** All parts for dividers have been ordered
 +
** Install 25 modules with new dividers on the CCAL, build prototype of LV patch pannel (check rate and noise)
 
* '''Installation of the FCAL2 detector''' -- Sasha / Arshak
 
* '''Installation of the FCAL2 detector''' -- Sasha / Arshak
 +
** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page]
 +
** Updates from the meetings with Tim's group [https://halldweb.jlab.org/wiki/index.php/November_16,_2022_FCAL_Insert_Installation_Meeting]
 +
** Manpower and division of tasks
 +
** [https://halldweb.jlab.org/wiki/index.php/List_of_tasks_and_manpower Projects for summer students]
 +
** Meeting with the detector imaging group
 
* '''Light Monitoring System''' -- Arshak
 
* '''Light Monitoring System''' -- Arshak
 +
**[https://userweb.jlab.org/~aasatury/Fcal_LMS/beam_test2/ Beam test]
 
* '''Simulations/Analysis'''
 
* '''Simulations/Analysis'''
 
* '''Talk on JEF at GHP conference'''
 
* '''Talk on JEF at GHP conference'''