Difference between revisions of "JEF meeting, February 18, 2022"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 6: Line 6:
  
 
* Preparation for mass production of FCAL2 modules -- Sasha
 
* Preparation for mass production of FCAL2 modules -- Sasha
**  got 6 more fixtures to preshape ESR. 16 fixtures can be loaded to the oven now. Expected DSG production rate: up to 72 foils per week
+
**  got 6 more fixtures from NPS to preshape ESR. 16 fixtures can be loaded to the oven now. Expected DSG production rate: up to 72 foils per week
 
***  Regular meeting with the DSG group during next week. Try to coordinate crystal wrapping.   
 
***  Regular meeting with the DSG group during next week. Try to coordinate crystal wrapping.   
 
** Arshak and Sasha are working on preparing supplies.
 
** Arshak and Sasha are working on preparing supplies.

Revision as of 22:10, 17 February 2022

Meeting time and location

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda