Line 25: | Line 25: | ||
*** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf All SICCAS 577 SICCAS] | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf All SICCAS 577 SICCAS] | ||
*** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 544 CRYTUR], Remaining: 133 | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 544 CRYTUR], Remaining: 133 | ||
− | ** Clean room EEL126 [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/8_5_22/eel_shelves.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/8_5_22/eel_shelves1.jpg]. | + | ** Clean room EEL126 [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/8_5_22/eel_shelves.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/8_5_22/eel_shelves1.jpg] |
+ | *** Expect to move to the new lab EEL108 (the same building) [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/8_5_22/eel_108.jpg] | ||
* Light Monitoring System -- Arshak | * Light Monitoring System -- Arshak |
Revision as of 09:21, 5 August 2022
Meeting time and location=
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Simulations/Analysis
- New IA vs old IA -- ig
- Preparation of parts for FCAL2 modules -- Sasha
- Received 25 crystals from CRYTUR (last from our 2nd order).
- Meeting with the DSG group [1]. Mindy and George will continue working on the project.
- Preparation of parts[2][3][4]
- Preshaping ESR foils (with the DSG)
- Wrapping crystals (with the DSG)
- Preparing Silicon cookies
- Module fabrication
- Cleaning brass assemblies
- Gluing light guides
- Wrapped CRYTUR crystals: 664
- All currently available (consider to borrow some spares from NPS)
- Module fabrication -- Sasha
- Received 85 PMT housings from Tim, they have been honed by Bobby. All of them will be used today.
- Status of fabrication
- Fabricated modules: Total 1121
- All SICCAS 577 SICCAS
- 544 CRYTUR, Remaining: 133
- Clean room EEL126 [5][6]
- Expect to move to the new lab EEL108 (the same building) [7]
- Light Monitoring System -- Arshak