Difference between revisions of "JEF meeting, August 5, 2022"
From GlueXWiki
(→Agenda) |
|||
(13 intermediate revisions by 3 users not shown) | |||
Line 6: | Line 6: | ||
* Simulations/Analysis | * Simulations/Analysis | ||
+ | ** [https://halldweb.jlab.org/wiki/images/4/4f/Glue-jefxd-igal-jaegle-05082022.pdf New IA vs old IA] -- ig | ||
* Preparation of parts for FCAL2 modules -- Sasha | * Preparation of parts for FCAL2 modules -- Sasha | ||
+ | ** [https://halldweb.jlab.org/wiki/index.php/CRYTUR Received 25 crystals from CRYTUR] (last from our 2nd order). | ||
+ | ** Meeting with the DSG group [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/8_5_22/fcal_status_8_2_22.pdf]. Mindy and George will continue working on the project. | ||
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf Preparation of parts][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students1.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students2.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students3.jpg] | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf Preparation of parts][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students1.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students2.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students3.jpg] | ||
*** Preshaping ESR foils (with the DSG) | *** Preshaping ESR foils (with the DSG) | ||
Line 17: | Line 20: | ||
*** <span style="color:#FF0000"> All currently available </span> (consider to borrow some spares from NPS) | *** <span style="color:#FF0000"> All currently available </span> (consider to borrow some spares from NPS) | ||
* Module fabrication -- Sasha | * Module fabrication -- Sasha | ||
+ | ** Received 85 PMT housings from Tim, they have been honed by Bobby. All of them will be used today. | ||
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf Status of fabrication ] | ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf Status of fabrication ] | ||
** Fabricated modules: <span style="color:#FF0000"> Total 1121 </span> | ** Fabricated modules: <span style="color:#FF0000"> Total 1121 </span> | ||
*** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf All SICCAS 577 SICCAS] | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf All SICCAS 577 SICCAS] | ||
− | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf | + | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 544 CRYTUR], Remaining: 133 |
− | ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/ | + | ** Clean room EEL126 [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/8_5_22/eel_shelves.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/8_5_22/eel_shelves1.jpg] |
+ | *** Expect to move to the new lab EEL108 (the same building) [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/8_5_22/eel_108.jpg] | ||
+ | *** Work on amending safety docs | ||
* Light Monitoring System -- Arshak | * Light Monitoring System -- Arshak | ||
+ | |||
+ | =Minutes= | ||
+ | Attendees: Phil, Tegan, Zisis, Liping, Jon, Olga, Jane, Susan, Sasha, S.T. | ||
+ | * Simon presented slides by Igal that compared the performance of the new implementation of the Island Algorithm (IA) for FCAL1/2 to the default (DA) FCAL1 algorithm | ||
+ | ** Looked at close clusters with one cluster energy fixed and varying energies of the second cluster, measuring the separation for the cases where 2 showers were returned by the reconstruction code | ||
+ | *** The maximum efficiency, especially for the FCAL1 case, is measurably lower than one for all separations (probably due to material before the FCAL) | ||
+ | *** For IA, the separation at which the efficiency drops off for smaller separations depends on the relative energy between the two clusters | ||
+ | *** The log-weighting method does not work properly for either DA or IA | ||
+ | *** The center-of-gravity weighting method for DA leads to multiple humps in the reconstructed separation distribution for FCAL2 | ||
+ | ** Igal also looked at separations using the CCAL shower code with a large CCAL replacing the FCAL | ||
+ | *** log- and center-of-gravity weighting look the same | ||
+ | *** Sees a bias away from true separations at lower separations | ||
+ | *** Maximum efficiency higher than FCAL1/2 results; could be due to material | ||
+ | *** (After the meeting) results don't seem to agree with previous results from Ilya using HyCAL data | ||
+ | * Preparation/Construction of FCAL2 modules continues | ||
+ | ** Received 25 modules from Crytur, expect more in the future, ~50 /month | ||
+ | ** Light guides coming next month | ||
+ | ** PMT housings arrived | ||
+ | ** Brass straps no longer bottleneck | ||
+ | ** 664 Crytur crystals now wrapped | ||
+ | ** Grand total of fabricated modules up to 1121 | ||
+ | *** Have components for module fabrication for 33/133 remaining crystals | ||
+ | * Plan to move to new area in EEL, currently not ready | ||
+ | * PMT dividers will be ordered next fiscal year | ||
+ | ** NPS see noise issues, but they are using a larger amplifier gain than we anticipate | ||
+ | ** GWU to help out with divider studies | ||
+ | * Plan to meet with Tim regarding installation schedule for next year | ||
+ | ** Frame design finalized | ||
+ | ** Also need to discuss cabling with Fernando -- thickness of cables, stress relief | ||
+ | * Refurbishment of lead glass blocks, Cockroft-Walton bases? | ||
+ | * Budget for next year needs to include money for LMS, also spare crystals? |
Latest revision as of 22:22, 11 August 2022
Meeting time and location=
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Simulations/Analysis
- New IA vs old IA -- ig
- Preparation of parts for FCAL2 modules -- Sasha
- Received 25 crystals from CRYTUR (last from our 2nd order).
- Meeting with the DSG group [1]. Mindy and George will continue working on the project.
- Preparation of parts[2][3][4]
- Preshaping ESR foils (with the DSG)
- Wrapping crystals (with the DSG)
- Preparing Silicon cookies
- Module fabrication
- Cleaning brass assemblies
- Gluing light guides
- Wrapped CRYTUR crystals: 664
- All currently available (consider to borrow some spares from NPS)
- Module fabrication -- Sasha
- Received 85 PMT housings from Tim, they have been honed by Bobby. All of them will be used today.
- Status of fabrication
- Fabricated modules: Total 1121
- All SICCAS 577 SICCAS
- 544 CRYTUR, Remaining: 133
- Clean room EEL126 [5][6]
- Expect to move to the new lab EEL108 (the same building) [7]
- Work on amending safety docs
- Light Monitoring System -- Arshak
Minutes
Attendees: Phil, Tegan, Zisis, Liping, Jon, Olga, Jane, Susan, Sasha, S.T.
- Simon presented slides by Igal that compared the performance of the new implementation of the Island Algorithm (IA) for FCAL1/2 to the default (DA) FCAL1 algorithm
- Looked at close clusters with one cluster energy fixed and varying energies of the second cluster, measuring the separation for the cases where 2 showers were returned by the reconstruction code
- The maximum efficiency, especially for the FCAL1 case, is measurably lower than one for all separations (probably due to material before the FCAL)
- For IA, the separation at which the efficiency drops off for smaller separations depends on the relative energy between the two clusters
- The log-weighting method does not work properly for either DA or IA
- The center-of-gravity weighting method for DA leads to multiple humps in the reconstructed separation distribution for FCAL2
- Igal also looked at separations using the CCAL shower code with a large CCAL replacing the FCAL
- log- and center-of-gravity weighting look the same
- Sees a bias away from true separations at lower separations
- Maximum efficiency higher than FCAL1/2 results; could be due to material
- (After the meeting) results don't seem to agree with previous results from Ilya using HyCAL data
- Looked at close clusters with one cluster energy fixed and varying energies of the second cluster, measuring the separation for the cases where 2 showers were returned by the reconstruction code
- Preparation/Construction of FCAL2 modules continues
- Received 25 modules from Crytur, expect more in the future, ~50 /month
- Light guides coming next month
- PMT housings arrived
- Brass straps no longer bottleneck
- 664 Crytur crystals now wrapped
- Grand total of fabricated modules up to 1121
- Have components for module fabrication for 33/133 remaining crystals
- Plan to move to new area in EEL, currently not ready
- PMT dividers will be ordered next fiscal year
- NPS see noise issues, but they are using a larger amplifier gain than we anticipate
- GWU to help out with divider studies
- Plan to meet with Tim regarding installation schedule for next year
- Frame design finalized
- Also need to discuss cabling with Fernando -- thickness of cables, stress relief
- Refurbishment of lead glass blocks, Cockroft-Walton bases?
- Budget for next year needs to include money for LMS, also spare crystals?