Difference between revisions of "JEF meeting, August 5, 2022"

From GlueXWiki
Jump to: navigation, search
Line 19: Line 19:
 
*** <span style="color:#FF0000"> All currently available </span> (consider to borrow some spares from NPS)
 
*** <span style="color:#FF0000"> All currently available </span> (consider to borrow some spares from NPS)
 
* Module fabrication  -- Sasha
 
* Module fabrication  -- Sasha
 +
** Received 85 PMT housings from Tim, they have been honed by Bobby. All of them will be used today.
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf  Status of fabrication ]
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf  Status of fabrication ]
 
** Fabricated modules: <span style="color:#FF0000"> Total 1121 </span>  
 
** Fabricated modules: <span style="color:#FF0000"> Total 1121 </span>  

Revision as of 08:54, 5 August 2022

Meeting time and location=

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

  • Simulations/Analysis
  • Preparation of parts for FCAL2 modules -- Sasha
    • Meeting with the DSG group. Mindy and George will continue working on the project.
    • Preparation of parts[1][2][3]
      • Preshaping ESR foils (with the DSG)
      • Wrapping crystals (with the DSG)
      • Preparing Silicon cookies
      • Module fabrication
      • Cleaning brass assemblies
      • Gluing light guides
    • Wrapped CRYTUR crystals: 664
      • All currently available (consider to borrow some spares from NPS)
  • Module fabrication -- Sasha
  • Light Monitoring System -- Arshak