** Fabricated modules: <span style="color:#FF0000"> Total 1153 </span>  
 
** Fabricated modules: <span style="color:#FF0000"> Total 1153 </span>  
 
*** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf All SICCAS 577 SICCAS]  
 
*** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf All SICCAS 577 SICCAS]  
*** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 544 CRYTUR], Remaining: 133
+
*** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 576 CRYTUR], Remaining: 121
 
** Clean room EEL126 [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/8_5_22/eel_shelves.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/8_5_22/eel_shelves1.jpg]
 
** Clean room EEL126 [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/8_5_22/eel_shelves.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/8_5_22/eel_shelves1.jpg]
 
*** Expect to move to the new lab EEL108 (the same building) [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/8_5_22/eel_108.jpg]
 
*** Expect to move to the new lab EEL108 (the same building) [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/8_5_22/eel_108.jpg]
 
*** Work on amending safety docs
 
*** Work on amending safety docs
 
* Light Monitoring System -- Arshak
 
* Light Monitoring System -- Arshak

Revision as of 23:29, 11 August 2022

Meeting time and location:

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

  • Simulations/Analysis
  • Preparation of parts for FCAL2 modules -- Sasha
  • Module fabrication -- Sasha
    • Received 85 PMT housings from Tim, they have been honed by Bobby. All of them will be used today.
    • Status of fabrication
    • Fabricated modules: Total 1153
    • Clean room EEL126 [5][6]
      • Expect to move to the new lab EEL108 (the same building) [7]
      • Work on amending safety docs
  • Light Monitoring System -- Arshak