* Preparation of parts for FCAL2 modules -- Sasha
 
* Preparation of parts for FCAL2 modules -- Sasha
 
* Module fabrication  -- Sasha
 
* Module fabrication  -- Sasha
 +
** Received 25 modules from Crytur, expect more in the future, ~50 /month
 +
** Light guides coming next month
 +
** PMT housings arrived
 +
** Brass straps no longer bottleneck
 +
** 664 Crytur crystals now wrapped
 +
** Grand total of fabricated modules up to 1121
 +
*** Have components for module fabrication for 33/133 remaining crystals
 +
* Plan to move to new area in EEL, currently not ready
 +
* PMT dividers will be ordered next fiscal year
 +
** NPS see noise issues, but they are using a larger amplifier gain than we anticipate
 +
** GWU to help out with divider studies
 +
* Plan to meet with Tim regarding installation schedule for next year
 +
** Frame design finalized
 +
** Also need to discuss cabling with Fernando -- thickness of cables, stress relief
 +
* Refurbishment of lead glass blocks, Cockroft-Walton bases?
 +
* Budget for next year needs to include money for LMS, also spare crystals?
 
* Light Monitoring System -- Arshak
 
* Light Monitoring System -- Arshak

Revision as of 23:13, 11 August 2022

Meeting time and location:

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

  • Simulations/Analysis
  • Preparation of parts for FCAL2 modules -- Sasha
  • Module fabrication -- Sasha
    • Received 25 modules from Crytur, expect more in the future, ~50 /month
    • Light guides coming next month
    • PMT housings arrived
    • Brass straps no longer bottleneck
    • 664 Crytur crystals now wrapped
    • Grand total of fabricated modules up to 1121
      • Have components for module fabrication for 33/133 remaining crystals
  • Plan to move to new area in EEL, currently not ready
  • PMT dividers will be ordered next fiscal year
    • NPS see noise issues, but they are using a larger amplifier gain than we anticipate
    • GWU to help out with divider studies
  • Plan to meet with Tim regarding installation schedule for next year
    • Frame design finalized
    • Also need to discuss cabling with Fernando -- thickness of cables, stress relief
  • Refurbishment of lead glass blocks, Cockroft-Walton bases?
  • Budget for next year needs to include money for LMS, also spare crystals?
  • Light Monitoring System -- Arshak