Difference between revisions of "JEF meeting, August 12, 2022"

From GlueXWiki
Jump to: navigation, search
(Created page with "Meeting time and location: *9:30 am EST (JLab time) remote only *Zoom meeting ID: [https://jlab-org.zoomgov.com/j/1610509142?pwd=STNZUmNoMElqbHRVdjlVb0ZzR1piZz09 161 050 9142]...")
 
(Agenda)
Line 6: Line 6:
  
 
* Simulations/Analysis
 
* Simulations/Analysis
 +
** [https://halldweb.jlab.org/wiki/index.php/CRYTUR Received 25 crystals from CRYTUR] (last from our 2nd order).
 +
** Meeting with the DSG group  [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/8_5_22/fcal_status_8_2_22.pdf].  Mindy and George will continue working on the project.
 +
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf Preparation of parts][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students1.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students2.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students3.jpg]
 +
*** Preshaping ESR foils (with the DSG)
 +
*** Wrapping crystals (with the DSG)
 +
*** Preparing Silicon cookies
 +
*** Module fabrication
 +
*** Cleaning brass assemblies
 +
*** Gluing light guides
 +
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals:] 664
 +
*** <span style="color:#FF0000"> All currently available </span> (consider to borrow some spares from NPS)
 
* Preparation of parts for FCAL2 modules -- Sasha
 
* Preparation of parts for FCAL2 modules -- Sasha
 
* Module fabrication  -- Sasha
 
* Module fabrication  -- Sasha
 
* Light Monitoring System -- Arshak
 
* Light Monitoring System -- Arshak

Revision as of 23:12, 11 August 2022

Meeting time and location:

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

  • Simulations/Analysis
  • Preparation of parts for FCAL2 modules -- Sasha
  • Module fabrication -- Sasha
  • Light Monitoring System -- Arshak