Difference between revisions of "JEF meeting, August 12, 2022"

From GlueXWiki
Jump to: navigation, search
Line 21: Line 21:
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals:] 684  
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals:] 684  
 
*** <span style="color:#FF0000"> All currently available </span> (consider to borrow some spares from NPS)
 
*** <span style="color:#FF0000"> All currently available </span> (consider to borrow some spares from NPS)
* Preparation of parts for FCAL2 modules -- Sasha
 
 
* Module fabrication  -- Sasha
 
* Module fabrication  -- Sasha
 
** Received 85 PMT housings from Tim, they have been honed by Bobby. All of them will be used today.
 
** Received 85 PMT housings from Tim, they have been honed by Bobby. All of them will be used today.

Revision as of 00:01, 14 August 2022

Meeting time and location:

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda