Difference between revisions of "JEF meeting, April 8, 2022"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 21: Line 21:
 
*  [https://halldweb.jlab.org/wiki/index.php/April_6,_2022_FCAL_2_Design_Meeting Meeting with Tim's group and Fernando regarding FCAL2 insert cables] -- Sasha
 
*  [https://halldweb.jlab.org/wiki/index.php/April_6,_2022_FCAL_2_Design_Meeting Meeting with Tim's group and Fernando regarding FCAL2 insert cables] -- Sasha
 
* Light Monitoring System -- Arshak
 
* Light Monitoring System -- Arshak
 +
**The 80x45cm piece of plexiglass is ready, got from machine shop end of the Thursday. 1st needs some polishing work on the edges, then planning to start studies for light uniformity tests in upcoming week. 
 +
** The order for integrating sphere is sent to procurement dept. for approval (price-2250$)
 
* COMCAL tests, TAC running, etc. -- Sasha
 
* COMCAL tests, TAC running, etc. -- Sasha
 
** Refurbishing FCAL lead glass modules: modules from the FCAL prototype [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/4_8_22/fcal_prot.jpg] [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/4_8_22/fcal_prot1.jpg]
 
** Refurbishing FCAL lead glass modules: modules from the FCAL prototype [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/4_8_22/fcal_prot.jpg] [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/4_8_22/fcal_prot1.jpg]

Revision as of 08:49, 8 April 2022

Meeting time and location

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

  • Meeting with Tim's group and Fernando regarding FCAL2 insert cables -- Sasha
  • Light Monitoring System -- Arshak
    • The 80x45cm piece of plexiglass is ready, got from machine shop end of the Thursday. 1st needs some polishing work on the edges, then planning to start studies for light uniformity tests in upcoming week.
    • The order for integrating sphere is sent to procurement dept. for approval (price-2250$)
  • COMCAL tests, TAC running, etc. -- Sasha
    • Refurbishing FCAL lead glass modules: modules from the FCAL prototype [6] [7]
  • Data analysis
  • Simulations