* Preparation for mass production of FCAL2 modules -- Sasha | * Preparation for mass production of FCAL2 modules -- Sasha | ||
** [https://halldweb.jlab.org/wiki/index.php/CRYTUR 60 CRYTUR crystals have been received (and accepted)] | ** [https://halldweb.jlab.org/wiki/index.php/CRYTUR 60 CRYTUR crystals have been received (and accepted)] | ||
− | ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/4_8_22/ | + | ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/4_8_22/nps_siccas1.jpg 91 + 40 = 131 SICCAS crystals were moved from the NPS lab][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/4_8_22/nps_siccas.jpg]. 40 of them have been checked/tested before. Crystals have to be inventorized. |
** Chris continues brazing brass straps. Some minor issues with brazing the front flange [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/4_8_22/bad_straps.jpg]. Pre-selected bad more than 20 assemblies [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/4_8_22/bad_straps1.jpg] (can be fixed). Revisited the brazing procedure with Tim and Chris. Chris was sick for a couple of days, some backlog in module fabrication. | ** Chris continues brazing brass straps. Some minor issues with brazing the front flange [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/4_8_22/bad_straps.jpg]. Pre-selected bad more than 20 assemblies [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/4_8_22/bad_straps1.jpg] (can be fixed). Revisited the brazing procedure with Tim and Chris. Chris was sick for a couple of days, some backlog in module fabrication. | ||
* Module fabrication -- Sasha | * Module fabrication -- Sasha |
Revision as of 20:00, 7 April 2022
Meeting time and location
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Preparation for mass production of FCAL2 modules -- Sasha
- 60 CRYTUR crystals have been received (and accepted)
- 91 + 40 = 131 SICCAS crystals were moved from the NPS lab[1]. 40 of them have been checked/tested before. Crystals have to be inventorized.
- Chris continues brazing brass straps. Some minor issues with brazing the front flange [2]. Pre-selected bad more than 20 assemblies [3] (can be fixed). Revisited the brazing procedure with Tim and Chris. Chris was sick for a couple of days, some backlog in module fabrication.
- Module fabrication -- Sasha
- Light Monitoring System -- Arshak
- COMCAL tests, TAC running, etc. -- Sasha
- Data analysis
- Simulations