Difference between revisions of "JEF meeting, April 29, 2022"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 6: Line 6:
  
 
* Preparation for mass production of FCAL2 modules -- Sasha
 
* Preparation for mass production of FCAL2 modules -- Sasha
 +
** DSG:
 +
*** 860 SICCAS foils preshaped. Need to preshape about 40 more, will switch to CRYTUR foils then
 +
*** Wrapping rate: about 20 crystals per week
 +
** Chris A continues to braze starps (have right now about 40 assemblies)
 +
** Igal continues cutting ESR, Tedlar, and Kapton foils
 +
** Silicon cookies (GWU)
 +
*** Olga is planning to come in the beginning of next week and bring some cookies (about 400), see her report
 
* Module fabrication  -- Sasha
 
* Module fabrication  -- Sasha
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf  Modules fabricated by Arshak and Sasha] [https://docs.google.com/document/d/1upI9M_RNR4qipzwg-SmxmzkqoCDU294x7Y3jT5M6DVY/edit (list on Google Drive)]  <span style="color:#FF0000"> Grand total 345  </span>
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf  Modules fabricated by Arshak and Sasha] [https://docs.google.com/document/d/1upI9M_RNR4qipzwg-SmxmzkqoCDU294x7Y3jT5M6DVY/edit (list on Google Drive)]  <span style="color:#FF0000"> Grand total 345  </span>

Revision as of 08:55, 29 April 2022

meeting time and location

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

  • Preparation for mass production of FCAL2 modules -- Sasha
    • DSG:
      • 860 SICCAS foils preshaped. Need to preshape about 40 more, will switch to CRYTUR foils then
      • Wrapping rate: about 20 crystals per week
    • Chris A continues to braze starps (have right now about 40 assemblies)
    • Igal continues cutting ESR, Tedlar, and Kapton foils
    • Silicon cookies (GWU)
      • Olga is planning to come in the beginning of next week and bring some cookies (about 400), see her report
  • Module fabrication -- Sasha
  • Light Monitoring System -- Arshak
  • COMCAL tests, TAC running, etc. -- Sasha
  • Data analysis
  • Simulations
  • Workshops/external meetings