Difference between revisions of "JEF meeting, April 15, 2022"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 18: Line 18:
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/4_8_22/modules_in_tedf_4_8_22.jpg  Fabricated modules in TEDF ]
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/4_8_22/modules_in_tedf_4_8_22.jpg  Fabricated modules in TEDF ]
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf  Status of fabrication ]
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf  Status of fabrication ]
 +
* Cable distribution of the FCAL insert -- Sasha
 +
** Connection of LV cables to the PMT base [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/4_15_22/lv_cables.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/4_15_22/lv_cables3.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/4_15_22/lv_cables2.jpg]
 
* Light Monitoring System -- Arshak
 
* Light Monitoring System -- Arshak
 
**https://halldweb.jlab.org/DocDB/0055/005557/001/lms_update_04_14_22.pdf
 
**https://halldweb.jlab.org/DocDB/0055/005557/001/lms_update_04_14_22.pdf

Revision as of 09:09, 15 April 2022

Meeting time and location=

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

  • Preparation for mass production of FCAL2 modules -- Sasha
    • Getting summer students involved in the project. Vaccinated students will be permitted to the lab according to the communication with Brian Hanlon (still to be checked). Not a problem to get 5 - 6 students involved (List of possible tasks).
    • Chris continues brazing brass straps. The quality has been improved. We have many brass assemblies now.
    • DSG:
      • About 700 ESR foils (SICCAS) have been preshaped. Start preshaping foils for CRYTUR crystals (after 900 foils for SICCAS are produced). Need new cutting template.
      • Crystal wrapping is very slow, only about 15 crystals have been wrapped during this week.
    • Production of Silicon cookies at the GWU [1]. See Olga's report. Contract with the GWU is under preparation.
    • Igal: continues wrapping ESR for crystals and Tedlar
    • Procurement of spare PMTs and sockets: no price increase [2]. Submitted PR for 100 PMTs and 200 sockets; not clear when it will be signed.
  • Module fabrication -- Sasha
  • Cable distribution of the FCAL insert -- Sasha
    • Connection of LV cables to the PMT base [3][4][5]
  • Light Monitoring System -- Arshak
  • COMCAL tests, TAC running, etc. -- Sasha
  • Data analysis
  • Simulations