* Preparation for mass production of FCAL2 modules -- Sasha
 
* Preparation for mass production of FCAL2 modules -- Sasha
 +
** Getting summer students involved in the project. Vaccinated students will be permitted to the lab according to the communication with Brian Hanlon (still to be checked). Not a problem to get 5 - 6 students involved ([https://halldweb.jlab.org/detectors/fcal2/module_fabrication/task_list/task_list_fcal2_fabrication_v2.pdf List of possible tasks]).
 +
** Chris continues brazing brass straps. The quality has been improved. We have many brass assemblies now.
 +
** DSG:
 +
***  About 700 ESR foils (SICCAS) have been preshaped. Start preshaping foils for CRYTUR crystals (after 900 foils for SICCAS are produced). Need new cutting template.
 +
***  Crystal wrapping is very slow, only about 15 crystals have been wrapped during this week.
 +
** Production of Silicon cookies at the GWU [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/4_8_22/image_50394113.JPG]. See Olga's report. Contract with the GWU is under preparation.
 +
** Igal: continues wrapping mu-metal foils and ESR
 +
** Procurement of spare PMTs and sockets:  no price increase [https://halldweb.jlab.org/detectors/fcal2/pmt/4125_quotes_fcal_04_06_22.pdf]. Submitted PR for 100 PMTs and 200 sockets; not clear when it will be signed.
 +
 
* Module fabrication  -- Sasha
 
* Module fabrication  -- Sasha
 
* Light Monitoring System -- Arshak
 
* Light Monitoring System -- Arshak

Revision as of 08:54, 15 April 2022

Meeting time and location=

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

  • Preparation for mass production of FCAL2 modules -- Sasha
    • Getting summer students involved in the project. Vaccinated students will be permitted to the lab according to the communication with Brian Hanlon (still to be checked). Not a problem to get 5 - 6 students involved (List of possible tasks).
    • Chris continues brazing brass straps. The quality has been improved. We have many brass assemblies now.
    • DSG:
      • About 700 ESR foils (SICCAS) have been preshaped. Start preshaping foils for CRYTUR crystals (after 900 foils for SICCAS are produced). Need new cutting template.
      • Crystal wrapping is very slow, only about 15 crystals have been wrapped during this week.
    • Production of Silicon cookies at the GWU [1]. See Olga's report. Contract with the GWU is under preparation.
    • Igal: continues wrapping mu-metal foils and ESR
    • Procurement of spare PMTs and sockets: no price increase [2]. Submitted PR for 100 PMTs and 200 sockets; not clear when it will be signed.