GlueX phase 2, 2023-01 data set

From GlueXWiki
Revision as of 00:01, 27 January 2023 by Ijaegle (Talk | contribs) (Periods)

Jump to: navigation, search

List of changes

These lists are giving the run ranges where the FCAL hardware was not changed.

Monitoring results

What is currently in the default variation

Periods

The periods in BOLD are calibrated i.e. have a pedestal and gain tables. Each period corresponds to constant FCAL and/or experimental conditions.

  • period 0: 120166-120222 (AMO, commissioning)
  • period 1: 120223-120266 (AMO mostly HV scans for TAGH/M, few cosmics, commissioning)
  • period 2: 120267-120268 (AMO & Empty Target, commissioning)
  • period 3: 120269-120285 (AMO, commissioning)
  • period 4: 120286-120311 (AMO not clear if Empty or Full)
  • period 5: 120312-120316 (PERP/PARA not clear if Empty or Full)
  • period 6: 120317-120318 (AMO not clear if Empty or Full)
  • period 7: 120319-120330 (PERP/PARA - AMO-120327 not clear if Empty or Full)
  • period 8: 120331-120373 (PERP/PARA - AMO-12036[2-4] Full)
  • period 9:

Timing

Pedestals

The pedestal calibration is performed for each run.

  • period 0: 120166-120222 (AMO)

Gain matching calibration plots

Checking the FCAL gains

Energy dependence correction monitoring plots

Timing calibration

Bad block map

This map is done for each run number by combining the info collected by analyzing the LED and pi0 skims.

  • period 0: 120166-120222 (AMO)