Difference between revisions of "GlueX Target Meeting, July 12, 2011"

From GlueXWiki
Jump to: navigation, search
(notes as minutes)
(Minutes: intermediate)
Line 27: Line 27:
 
=Minutes=
 
=Minutes=
  
jim f., elliott, tim hovanes, mark
+
Present:
rory
+
* '''JLab''': Hovanes Egiyan, Jim Fochtman, Mark Ito, Tim Whitlatch (chair), Elliott Wolin
 +
* '''UMass''': Rory Miskimen
  
jim talked with ck, looked at company information
+
==Drawings==
  
get Werners latest mechanical scheme
+
We spent most of the meeting reviewing various aspects of drawings Jim and produced of the target, start counter, and refrigerator.
  
 +
* Jim talked to Chris Keith and started from a 3-D drawing that Chuck had done a couple of years ago.
 +
* Jim will send out the set of drawings to the hall-target email list.
 +
* The condenser has been moved much closer to the target cell than in previous designs. The current system is designed for hydrogen and deuterium; it cannot cool the target cell to liquid helium temperatures, although the refrigerator itself can reach those temperatures, by design.
 +
* We need to start getting mechanical design details from Werner for the the start counter. It must be integrated with the other components in this region.
  
refrigerator, want to award oct 1, want a pr in about a month
+
==Procurement==
 +
 
 +
* We would like to buy the refrigerator at the beginning of FY12. That means we need to have a PR written in a month or so.
 +
 
 +
send rory a doc file

Revision as of 15:12, 12 July 2011

Location, Time

Tuesday, July 12, 2011
1:00 pm EST
JLab: CEBAF Center, Room F228

Agenda

  1. Review minutes from previous meeting: all
  2. Target Work Reports: all
  3. MOU status: Mark and Rory

Communication

Telephone

To connect by telephone:

  1. dial:
  2. enter access code followed by the # sign: 3421244#

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2011-3Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2011-3Q/ .

Minutes

Present:

  • JLab: Hovanes Egiyan, Jim Fochtman, Mark Ito, Tim Whitlatch (chair), Elliott Wolin
  • UMass: Rory Miskimen

Drawings

We spent most of the meeting reviewing various aspects of drawings Jim and produced of the target, start counter, and refrigerator.

  • Jim talked to Chris Keith and started from a 3-D drawing that Chuck had done a couple of years ago.
  • Jim will send out the set of drawings to the hall-target email list.
  • The condenser has been moved much closer to the target cell than in previous designs. The current system is designed for hydrogen and deuterium; it cannot cool the target cell to liquid helium temperatures, although the refrigerator itself can reach those temperatures, by design.
  • We need to start getting mechanical design details from Werner for the the start counter. It must be integrated with the other components in this region.

Procurement

  • We would like to buy the refrigerator at the beginning of FY12. That means we need to have a PR written in a month or so.

send rory a doc file