Difference between revisions of "GlueX TOF Meeting, September 13, 2012"
(→Agenda) |
(notes as minutes) |
||
Line 28: | Line 28: | ||
Talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2012-3Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-3Q/ . | Talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2012-3Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-3Q/ . | ||
+ | |||
+ | =Minutes= | ||
+ | |||
+ | New Note 21 | ||
+ | |||
+ | randall, sasha, paul, ian | ||
+ | mark eugene tim | ||
+ | |||
+ | announcements | ||
+ | |||
+ | contract | ||
+ | |||
+ | last minutes | ||
+ | |||
+ | bent pieces, try 'em and see | ||
+ | |||
+ | • polishing light guides | ||
+ | • more uvt material ordered and received | ||
+ | • make the longer light guides | ||
+ | • design in hand, but never made | ||
+ | • light guides for first articles | ||
+ | • can only be made at a certain rate | ||
+ | |||
+ | |||
+ | calibration | ||
+ | new note | ||
+ | |||
+ | tdr | ||
+ | Paul is looking at it | ||
+ | |||
+ | meeting on invoicing and spending | ||
+ | |||
+ | |||
+ | evms, notes from Eugene | ||
+ | |||
+ | start date, end date | ||
+ | labor, materials | ||
+ | labor, h: 0 50% 100% | ||
+ | u: claim percentage | ||
+ | predecessor and succesor for each activity |
Revision as of 14:55, 13 September 2012
GlueX TOF Meeting
Thursday, September 13, 2012
10:00 am EDT
JLab: CEBAF Center, F326
Agenda
- Announcements
- Review of last TOF bi-weekly meeting
- Mechanical design
- TDC implementation
- Contract status -> EVMS status
- Calibration and Alignment
- Technical Design Report contribution
- Four JLab tubes: ship FL to VA[?]
Communication
Videoconference
- ESNet: 8542553
- EVO: EVO site
- meeting link
- Phone bridge ID: 13 7104
Slides
Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2012-3Q
on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-3Q/ .
Minutes
New Note 21
randall, sasha, paul, ian mark eugene tim
announcements
contract
last minutes
bent pieces, try 'em and see
• polishing light guides • more uvt material ordered and received • make the longer light guides • design in hand, but never made • light guides for first articles • can only be made at a certain rate
calibration
new note
tdr Paul is looking at it
meeting on invoicing and spending
evms, notes from Eugene
start date, end date labor, materials labor, h: 0 50% 100% u: claim percentage predecessor and succesor for each activity