New Note 21
+
Present:
 +
* '''FSU''': Paul Eugenio, Sasha Ostrovidov, Randall Smith, Ian Winger
 +
* '''JLab''': Eugene Chudakov, Mark Ito (chair), Tim Whitlatch
  
randall, sasha, paul, ian
+
==Announcements==
mark eugene tim
+
  
announcements
+
* The construction contract between FSU and JLab has been signed by both parties.
  
  contract
+
==Review of Last Meeting==
  
last minutes
+
We went over the [[minutes from the ??? meeting]].
  
  bent pieces, try 'em and see
+
FSU reported last time that the bent plates sent from JLab did not look as good as expected. Tim thought we should try them in the mini-TOF anyway and see if they cause a problem.
  
• polishing light guides
+
==Mechanical Design==
• more uvt material ordered and received
+
• make the longer light guides
+
• design in hand, but never made
+
• light guides for first articles
+
• can only be made at a certain rate
+
  
 +
Ian showed a drawing of a [[File:TOFLightGuideGluingStation.pdf|fixture for gluing light guides to scintillator]]. The plan is to add a temporary counterweight to each light guide so that the combination of light guide and weight will sit on top of a scintillator bar without additional clamping or support. Gravity will then supply the clamp for gluing. He showed a sample weight. The overall fixture can be rotated 180 degrees to glue light guides to the "other" side.
  
calibration
+
==Mini-TOF Construction==
new note
+
  
tdr
+
Current activities include:
Paul is looking at it
+
* polishing light guides
 +
* more UVT was material ordered and received
 +
* making the longer light guides for the central counters
 +
** design in hand, but never made before now
  
meeting on invoicing and spending
+
==TDC Implementation==
  
 +
At some point we need to identify manpower to make sure that the ancillary boards needed to incorporate the CAEN TDC's into the data acquisition are produced and their use understood. Only prototypes exist at present. Hall B will be using them, so we are not alone in having this need.
 +
 +
==Calibration and Alignment==
 +
 +
Sasha will produce a note on the current plans. It should be ready by the Collaboration Meeting. He is running some Monte Carlo simulations to test the ideas.
 +
 +
==Technical Design Report==
 +
 +
Paul is making progress.
 +
 +
==Contract status and EVMS status==
 +
 +
We will need to make pick points for the EVMS plan before the end of the month. Mark will consult with Beni and circulate a draft.
 +
 +
We plan to have a meeting next week to discuss details of invoicing and payment.
  
 
evms, notes from Eugene
 
evms, notes from Eugene

Revision as of 16:23, 14 September 2012

GlueX TOF Meeting
Thursday, September 13, 2012
10:00 am EDT
JLab: CEBAF Center, F326

Agenda

  1. Announcements
  2. Review of last TOF bi-weekly meeting
  3. Mechanical design
    1. File:TOFLightGuideGluingStation.pdf
  4. TDC implementation
  5. Contract status -> EVMS status
  6. Calibration and Alignment
  7. Technical Design Report contribution
  8. Four JLab tubes: ship FL to VA[?]

Communication

Videoconference

  1. ESNet: 8542553
  2. EVO: EVO site

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2012-3Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-3Q/ .

Minutes

Present:

  • FSU: Paul Eugenio, Sasha Ostrovidov, Randall Smith, Ian Winger
  • JLab: Eugene Chudakov, Mark Ito (chair), Tim Whitlatch

Announcements

  • The construction contract between FSU and JLab has been signed by both parties.

Review of Last Meeting

We went over the minutes from the ??? meeting.

FSU reported last time that the bent plates sent from JLab did not look as good as expected. Tim thought we should try them in the mini-TOF anyway and see if they cause a problem.

Mechanical Design

Ian showed a drawing of a File:TOFLightGuideGluingStation.pdf. The plan is to add a temporary counterweight to each light guide so that the combination of light guide and weight will sit on top of a scintillator bar without additional clamping or support. Gravity will then supply the clamp for gluing. He showed a sample weight. The overall fixture can be rotated 180 degrees to glue light guides to the "other" side.

Mini-TOF Construction

Current activities include:

  • polishing light guides
  • more UVT was material ordered and received
  • making the longer light guides for the central counters
    • design in hand, but never made before now

TDC Implementation

At some point we need to identify manpower to make sure that the ancillary boards needed to incorporate the CAEN TDC's into the data acquisition are produced and their use understood. Only prototypes exist at present. Hall B will be using them, so we are not alone in having this need.

Calibration and Alignment

Sasha will produce a note on the current plans. It should be ready by the Collaboration Meeting. He is running some Monte Carlo simulations to test the ideas.

Technical Design Report

Paul is making progress.

Contract status and EVMS status

We will need to make pick points for the EVMS plan before the end of the month. Mark will consult with Beni and circulate a draft.

We plan to have a meeting next week to discuss details of invoicing and payment.

evms, notes from Eugene

start date, end date labor, materials labor, h: 0 50% 100% u: claim percentage predecessor and succesor for each activity