Difference between revisions of "GlueX TOF Meeting, September 13, 2012"

From GlueXWiki
Jump to: navigation, search
(adjusted)
(Agenda)
Line 13: Line 13:
 
# Calibration and Alignment
 
# Calibration and Alignment
 
# Technical Design Report contribution
 
# Technical Design Report contribution
 +
# Four JLab tubes: ship FL to VA[?]
  
 
=Communication=
 
=Communication=

Revision as of 10:54, 12 September 2012

GlueX TOF Meeting
Thursday, September 13, 2012
10:00 am EDT
JLab: CEBAF Center, F326

Agenda

  1. Announcements
  2. Review of last TOF bi-weekly meeting
  3. Mechanical design
  4. TDC implementation
  5. Contract status -> EVMS status
  6. Calibration and Alignment
  7. Technical Design Report contribution
  8. Four JLab tubes: ship FL to VA[?]

Communication

Videoconference

  1. ESNet: 8542553
  2. EVO: EVO site

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2012-3Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-3Q/ .