Difference between revisions of "GlueX TOF Meeting, October 25, 2012"

From GlueXWiki
Jump to: navigation, search
(adjusted)
(Agenda)
Line 9: Line 9:
 
# Review of [[GlueX TOF Meeting, September 27, 2012#Minutes|last TOF bi-weekly meeting]]
 
# Review of [[GlueX TOF Meeting, September 27, 2012#Minutes|last TOF bi-weekly meeting]]
 
# Mechanical design
 
# Mechanical design
 +
## MiniTOF
 +
## TOF Gluing Fixture
 +
## TOF Module Wrapper
 
# Contract status
 
# Contract status
 +
## PMT assessments of batch 1
 +
## Procurements
 
# Calibration and Alignment
 
# Calibration and Alignment
 
# Technical Design Report contribution
 
# Technical Design Report contribution

Revision as of 08:32, 25 October 2012

GlueX TOF Meeting
Thursday, October 25, 2012
10:00 am EDT
JLab: CEBAF Center, F326

Agenda

  1. Announcements
  2. Review of last TOF bi-weekly meeting
  3. Mechanical design
    1. MiniTOF
    2. TOF Gluing Fixture
    3. TOF Module Wrapper
  4. Contract status
    1. PMT assessments of batch 1
    2. Procurements
  5. Calibration and Alignment
  6. Technical Design Report contribution

Communication

Videoconference

  1. ESNet: 8542553
  2. EVO: EVO site

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2012-4Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-4Q/ .