=Announcement=
+
==Announcement==
  
 
* The second shipment of 30 PMTs has been sent from Hamamatsu. they have not yet arrived at FSU. The [[TOF PMT Shipping schedule|nominal shipment schedule]] is posted on this wiki.
 
* The second shipment of 30 PMTs has been sent from Hamamatsu. they have not yet arrived at FSU. The [[TOF PMT Shipping schedule|nominal shipment schedule]] is posted on this wiki.
shipment of batch 2 has been sent
+
 
 +
==Mechanical Design==
 +
 
 +
===Mini-TOF Construction===
 +
 
 +
Paul reviewed [http://hadron.physics.fsu.edu/wiki/index.php/MiniTOF his wiki page] (standard GlueX username and password) showing progress and status. Photos of some of the machined parts are also shown.
 +
 
 
macining going on for gluing structure
 
macining going on for gluing structure
 
macining for 9
 
macining for 9

Revision as of 14:26, 25 October 2012

GlueX TOF Meeting
Thursday, October 25, 2012
10:00 am EDT
JLab: CEBAF Center, F326

Agenda

  1. Announcements
  2. Review of last TOF bi-weekly meeting
  3. Mechanical design
    1. [MiniTOF]
    2. [TOF Gluing Fixture]
    3. TOF Module Wrapper
  4. Contract status
    1. PMT assessments of batch 1 [wiki]
    2. Procurements
    3. Change request
  5. Calibration and Alignment
  6. Technical Design Report contribution

Communication

Videoconference

  1. ESNet: 8542553
  2. EVO: EVO site

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2012-4Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-4Q/ .

Minutes

Present:

  • FSU: Paul Eugenio, Sasha Ostrovidov
  • JLab: Eugene Chudakov, Chuck Hutton, Mark Ito (chair),

Announcement

  • The second shipment of 30 PMTs has been sent from Hamamatsu. they have not yet arrived at FSU. The nominal shipment schedule is posted on this wiki.

Mechanical Design

Mini-TOF Construction

Paul reviewed his wiki page (standard GlueX username and password) showing progress and status. Photos of some of the machined parts are also shown.

macining going on for gluing structure macining for 9 implement for 5 initially assembly starts by ian next week

tof module wrapper, wiki page coming long rectanular tube to prototype wrapper shown during collaboration meeting

constrat staus assessment of batch one

database

procurements

two big lead items

scint and light guide scintillator PO went out oct 3. called Eljen, expect first article arrive nov 21

light guide

order stuck in purchasing, now has been issued earlier this week 92 feet expected nov 5 4 ft bars 2.5 weeks after order, 1st batch machine shop set-up to machine long, hlaf widt guides 1st batch will go to those then set up for full-width guides

ESR in log sheets not resolved yet

send shipping address to paul!!! find out about delaying payment