Difference between revisions of "GlueX TOF Meeting, October 25, 2012"

From GlueXWiki
Jump to: navigation, search
(notes as minutes)
(Minutes)
Line 34: Line 34:
 
=Minutes=
 
=Minutes=
  
tof meeting notes, 10/25/12
+
Present:
 
+
* '''FSU''': Paul Eugenio, Sasha Ostrovidov
eugene chuck mark
+
* '''JLab''': Eugene Chudakov, Chuck Hutton, Mark Ito (chair),
paul sasha
+
  
 
announcement
 
announcement

Revision as of 13:01, 25 October 2012

GlueX TOF Meeting
Thursday, October 25, 2012
10:00 am EDT
JLab: CEBAF Center, F326

Agenda

  1. Announcements
  2. Review of last TOF bi-weekly meeting
  3. Mechanical design
    1. [MiniTOF]
    2. [TOF Gluing Fixture]
    3. TOF Module Wrapper
  4. Contract status
    1. PMT assessments of batch 1 [wiki]
    2. Procurements
    3. Change request
  5. Calibration and Alignment
  6. Technical Design Report contribution

Communication

Videoconference

  1. ESNet: 8542553
  2. EVO: EVO site

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2012-4Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-4Q/ .

Minutes

Present:

  • FSU: Paul Eugenio, Sasha Ostrovidov
  • JLab: Eugene Chudakov, Chuck Hutton, Mark Ito (chair),

announcement shipment of batch 2 has been sent macining going on for gluing structure macining for 9 implement for 5 initially assembly starts by ian next week

tof module wrapper, wiki page coming long rectanular tube to prototype wrapper shown during collaboration meeting

constrat staus assessment of batch one

database

procurements

two big lead items

scint and light guide scintillator PO went out oct 3. called Eljen, expect first article arrive nov 21

light guide

order stuck in purchasing, now has been issued earlier this week 92 feet expected nov 5 4 ft bars 2.5 weeks after order, 1st batch machine shop set-up to machine long, hlaf widt guides 1st batch will go to those then set up for full-width guides

ESR in log sheets not resolved yet

send shipping address to paul!!! find out about delaying payment