Difference between revisions of "GlueX TOF Meeting, March 14, 2013"

From GlueXWiki
Jump to: navigation, search
(Minutes)
(Construction Status)
Line 32: Line 32:
 
* '''JLab''': Chuck Hutton, Mark Ito (chair), Beni Zihlmann
 
* '''JLab''': Chuck Hutton, Mark Ito (chair), Beni Zihlmann
  
=Construction Status=
+
==Construction Status==
  
 
Paul led us through several photographs of construction progress at FSU (username: gluex, password: the-standard-gluex-password).
 
Paul led us through several photographs of construction progress at FSU (username: gluex, password: the-standard-gluex-password).
Line 43: Line 43:
 
** Fabricated Components as they arrived
 
** Fabricated Components as they arrived
 
* [http://hadron.physics.fsu.edu/wiki/index.php/Attaching_PMTs_to_module Attaching PMTs to module]: clamp arrangement for gluing PMTs to light guides
 
* [http://hadron.physics.fsu.edu/wiki/index.php/Attaching_PMTs_to_module Attaching PMTs to module]: clamp arrangement for gluing PMTs to light guides
 +
 +
==Readiness Review==
 +
 +
The review is scheduled for Friday, March 22 at FSU.
 +
 +
===Agenda===
 +
 +
We went over the [http://hadron.physics.fsu.edu/wiki/index.php/Readiness_Review agenda] that Paul had prepared. There is a full schedule of touring facilities in the morning. We agreed on two changes:
 +
# Allow more time, at least and hour, for a presentation of construction status in the morning. This will push the Overview of Technical Procedures session to after lunch.
 +
# Block some time for financial types from JLab and FSU to discuss invoicing and other related matters.

Revision as of 13:40, 14 March 2013

GlueX TOF Meeting
Thursday, March 14, 2013
10:00 am EDT
JLab: CEBAF Center, F326/327

Agenda

  1. Announcements
  2. Review of last TOF bi-weekly meeting
  3. Construction status
  4. Readiness Review, March 22

Communication

Videoconference

  1. ESNet: 8542553
  2. SeeVogh: SeeVogh site

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2013-1Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2013-1Q/ .

Minutes

Present:

  • FSU: Maurizio Bertoli, Paul Eugenio, Sasha Ostrovidov
  • JLab: Chuck Hutton, Mark Ito (chair), Beni Zihlmann

Construction Status

Paul led us through several photographs of construction progress at FSU (username: gluex, password: the-standard-gluex-password).

  • First Article Modules: standard, half-width, and half length on the construction table, wrapped and with light guides and PMTs attached.
  • MiniTOF:
    • MiniTOF Support Stand
    • Assembly steps
    • Design drawings from Chuck
    • Fabricated Components as they arrived
  • Attaching PMTs to module: clamp arrangement for gluing PMTs to light guides

Readiness Review

The review is scheduled for Friday, March 22 at FSU.

Agenda

We went over the agenda that Paul had prepared. There is a full schedule of touring facilities in the morning. We agreed on two changes:

  1. Allow more time, at least and hour, for a presentation of construction status in the morning. This will push the Overview of Technical Procedures session to after lunch.
  2. Block some time for financial types from JLab and FSU to discuss invoicing and other related matters.