Difference between revisions of "GlueX TOF Meeting, March 14, 2013"

From GlueXWiki
Jump to: navigation, search
(Slides)
Line 14: Line 14:
 
# [[Time-of-Flight Construction Readiness Review|Readiness Review, March 22]]
 
# [[Time-of-Flight Construction Readiness Review|Readiness Review, March 22]]
 
#* [http://hadron.physics.fsu.edu/wiki/index.php/Readiness_Review draft agenda]
 
#* [http://hadron.physics.fsu.edu/wiki/index.php/Readiness_Review draft agenda]
 
=References=
 
 
# [http://hadron.physics.fsu.edu/wiki/index.php/MiniTOF MiniTOF]
 
# [http://hadron.physics.fsu.edu/wiki/index.php/GluingStructure TOF Gluing Fixture]
 
# [http://hadron.physics.fsu.edu/wiki/index.php/GlueX_Time-of-Flight PMT testing]
 
  
 
=Communication=
 
=Communication=

Revision as of 13:23, 14 March 2013

GlueX TOF Meeting
Thursday, March 14, 2013
10:00 am EDT
JLab: CEBAF Center, F326/327

Agenda

  1. Announcements
  2. Review of last TOF bi-weekly meeting
  3. Construction status
  4. Readiness Review, March 22

Communication

Videoconference

  1. ESNet: 8542553
  2. SeeVogh: SeeVogh site

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2013-1Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2013-1Q/ .

Minutes

Present:

  • FSU: Maurizio Bertoli, Paul Eugenio, Sasha Ostrovidov
  • JLab: Chuck Hutton, Mark Ito (chair), Beni Zihlmann