Difference between revisions of "GlueX TOF Meeting, June 2, 2021"

From GlueXWiki
Jump to: navigation, search
(first draft)
 
(add minutes)
 
Line 13: Line 13:
 
# TOF NIM paper
 
# TOF NIM paper
 
# Action Item Recap
 
# Action Item Recap
 +
 +
== Minutes ==
 +
 +
Present: Edmundo Barriga, Paul Eugenio, Mark Ito, Sasha Ostrovidov, Beni Zihlmann
 +
<!--There is a [https://bluejeans.com/s/AZJnaZ2Ys9i/recording of this meeting]. Log into the [https://jlab.bluejeans.com BlueJeans site] first to gain access (use your JLab credentials).-->
 +
 +
=== Air Light Guide Test ===
 +
 +
We discussed the proposal for testing air light guides in the coming run. Several collaborators have expressed concerns about changing the TOF configuration without a plan for thorough testing. Paul conceded that since the TOF will be in the trigger for CPP, more study is warranted before a test installation. So this will not be part of the plan for his upcoming visit, scheduled for June 14-18. We are still awaiting authorization from Physics Division for that trip.
 +
 +
=== Equipment Purchase at FSU ===
 +
 +
Paul reported that they have ordered a VXI crate. When it arrives he will be able to return the one on loan from JLab.

Latest revision as of 11:48, 2 June 2021

GlueX Time-of-Flight Meeting
Wednesday, June 2, 2021
10:00 am EDT
BlueJeans: 350 531 998

Agenda

  1. Announcements
  2. Review of minutes from the last meeting
  3. PMT Repair
  4. Air Light Guides
  5. TOF II Trigger
  6. TOF NIM paper
  7. Action Item Recap

Minutes

Present: Edmundo Barriga, Paul Eugenio, Mark Ito, Sasha Ostrovidov, Beni Zihlmann

Air Light Guide Test

We discussed the proposal for testing air light guides in the coming run. Several collaborators have expressed concerns about changing the TOF configuration without a plan for thorough testing. Paul conceded that since the TOF will be in the trigger for CPP, more study is warranted before a test installation. So this will not be part of the plan for his upcoming visit, scheduled for June 14-18. We are still awaiting authorization from Physics Division for that trip.

Equipment Purchase at FSU

Paul reported that they have ordered a VXI crate. When it arrives he will be able to return the one on loan from JLab.