Difference between revisions of "GlueX TOF Meeting, January 17, 2013"
From GlueXWiki
(adjusted) |
(→Agenda) |
||
Line 8: | Line 8: | ||
# Announcements | # Announcements | ||
# Review of [[GlueX TOF Meeting, December 20, 2012#Minutes|last TOF bi-weekly meeting]] | # Review of [[GlueX TOF Meeting, December 20, 2012#Minutes|last TOF bi-weekly meeting]] | ||
− | # | + | # Construction status |
+ | ## MiniTOF support structure built | ||
+ | ## ESR material has arrived at FSU | ||
+ | ## Scintillator purchase | ||
+ | ### The manufacturer of the TOF scintillator bars is asking if we can get by with about a dozen of the long bars which are shorter by an 1/8" | ||
+ | ### I suggest we approve request | ||
+ | ## Light Guide manufacturing 25% completed, 90% partially milled, 25% milled, 10% pollished | ||
# Contract status | # Contract status | ||
# Calibration and Alignment | # Calibration and Alignment |
Revision as of 10:49, 17 January 2013
GlueX TOF Meeting
Thursday, January 17, 2013
10:00 am EST
JLab: CEBAF Center, L207
Agenda
- Announcements
- Review of last TOF bi-weekly meeting
- Construction status
- MiniTOF support structure built
- ESR material has arrived at FSU
- Scintillator purchase
- The manufacturer of the TOF scintillator bars is asking if we can get by with about a dozen of the long bars which are shorter by an 1/8"
- I suggest we approve request
- Light Guide manufacturing 25% completed, 90% partially milled, 25% milled, 10% pollished
- Contract status
- Calibration and Alignment
- Technical Design Report contribution
References
Communication
Videoconference
- ESNet: 8542553
- EVO: SeeVogh site
- meeting link
- Phone bridge ID: 15 1627
Slides
Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2013-1Q
on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2013-1Q/ .