# Announcements
 
# Announcements
 
# Review of [[GlueX TOF Meeting, December 20, 2012#Minutes|last TOF bi-weekly meeting]]
 
# Review of [[GlueX TOF Meeting, December 20, 2012#Minutes|last TOF bi-weekly meeting]]
# Mechanical design
+
# Construction status
 +
## MiniTOF support structure built
 +
## ESR material has arrived at FSU
 +
## Scintillator purchase
 +
### The manufacturer of the TOF scintillator bars is asking if we can get by with about a dozen of the long bars which are shorter by an 1/8"
 +
### I suggest we approve request
 +
## Light Guide manufacturing 25% completed, 90% partially milled, 25% milled, 10% pollished
 
# Contract status
 
# Contract status
 
# Calibration and Alignment
 
# Calibration and Alignment

Revision as of 10:49, 17 January 2013

GlueX TOF Meeting
Thursday, January 17, 2013
10:00 am EST
JLab: CEBAF Center, L207

Agenda

  1. Announcements
  2. Review of last TOF bi-weekly meeting
  3. Construction status
    1. MiniTOF support structure built
    2. ESR material has arrived at FSU
    3. Scintillator purchase
      1. The manufacturer of the TOF scintillator bars is asking if we can get by with about a dozen of the long bars which are shorter by an 1/8"
      2. I suggest we approve request
    4. Light Guide manufacturing 25% completed, 90% partially milled, 25% milled, 10% pollished
  4. Contract status
  5. Calibration and Alignment
  6. Technical Design Report contribution

References

  1. MiniTOF
  2. TOF Gluing Fixture
  3. PMT testing

Communication

Videoconference

  1. ESNet: 8542553
  2. EVO: SeeVogh site

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2013-1Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2013-1Q/ .