Difference between revisions of "GlueX Start Counter Meeting, June 28, 2012"

From GlueXWiki
Jump to: navigation, search
(Minutes: present)
(Minutes: add some headers)
Line 31: Line 31:
 
* '''FIU''': Werner Boeglin
 
* '''FIU''': Werner Boeglin
 
* '''JLab''': Eugene Chudakov, Chuck Hutton, Mark Ito (chair), Beni Zihlmann
 
* '''JLab''': Eugene Chudakov, Chuck Hutton, Mark Ito (chair), Beni Zihlmann
 +
 +
==Prototype Testing==
  
 
sr90 source
 
sr90 source
Line 37: Line 39:
 
wrapping the detectors,
 
wrapping the detectors,
 
prevent contact with reflective material
 
prevent contact with reflective material
 +
 +
==Read-Out Design==
  
 
mini coax still needed for start counter
 
mini coax still needed for start counter
  
 +
==Mechanical Design==
 
mechanical on hold
 
mechanical on hold
 
concept there
 
concept there
Line 50: Line 55:
 
scintillators cost, platic craft 3k for 5
 
scintillators cost, platic craft 3k for 5
 
mcneal $700 per, 200 $ per
 
mcneal $700 per, 200 $ per
 +
 +
==Contract==
  
 
start on the con
 
start on the con
 
today, send example to werner, mark
 
today, send example to werner, mark
 +
 +
==Simulation==
  
 
puneet background studies, issues to resolve
 
puneet background studies, issues to resolve

Revision as of 14:08, 28 June 2012

GlueX Start Counter Meeting
Thursday, June 28, 2012
10 am EDT
JLab: CEBAF Center F326/327

Agenda

  1. Announcements
  2. Review minutes from previous meeting
  3. Mechanical Design
  4. Read-out Design
  5. Simulation: Start Counter Background Studies
  6. Contract

Communication Information

Video Conferencing

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2012-2Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-2Q/ .

Minutes

Present:

  • FIU: Werner Boeglin
  • JLab: Eugene Chudakov, Chuck Hutton, Mark Ito (chair), Beni Zihlmann

Prototype Testing

sr90 source order 2 or three more detectors

wrapping the detectors, prevent contact with reflective material

Read-Out Design

mini coax still needed for start counter

Mechanical Design

mechanical on hold concept there look at schedule, make in october

device for assembly if central support , need something to hold things in place pneumatic pistons 3rd of august start assembly scintillators cost, platic craft 3k for 5 mcneal $700 per, 200 $ per

Contract

start on the con today, send example to werner, mark

Simulation

puneet background studies, issues to resolve 10^7 running, 5 and 50 kHz for em background

puneet will report in two weeks