Line 11: Line 11:
 
# [https://halldweb.jlab.org/wiki/images/f/fc/Sc_meeting.pdf New mounting design for Start Counter (Igal)]
 
# [https://halldweb.jlab.org/wiki/images/f/fc/Sc_meeting.pdf New mounting design for Start Counter (Igal)]
 
# Action Item Review
 
# Action Item Review
 +
 +
== Minutes ==
 +
 +
Present: Eugene Chudakov, Sean Dobbs, Mark Ito (chair), Igal Jaegle, Simon Taylor, Tim Whitlatch, Beni Zihlmann
 +
 +
There is [https://bluejeans.com/s/Az6OKsq8MyD/ a recording of this meeting] on the BlueJeans site. Use your JLab credentials to gain access.
 +
 +
=== Review of minutes from the last meeting ===
 +
 +
We went over the [[GlueX Start Counter Meeting, March 18, 2021#Minutes|minutes from the meeting on March 18]]. In response to his inquiries, Mark received the Purchase Requisition for the Start Counter SiPMs from Sasha Somov and the specs of the devices from Fernando Barbosa.
 +
 +
=== New mounting design for Start Counter ===
 +
 +
Igal presented an idea for mounting a new μRWELL detector outside the scattering chamber but inside the start counter to give better spatial resolution near the event vertex. He has been working with Simon Taylor, Sean Dobbs, Sergey Furletov, Stuart Ferguson[?], and Kondo Gnanvo. He focused on mechanical design considerations in his presentation. The current configuration of the start counter/target region would not accommodate cables for the detector. Igal proposes moving the start counter 15 cm downstream with respect to the target to open up space for cable penetrations. See [[Media:Sc_meeting.pdf|his slides]] for the details.
 +
 +
From the discussion:
 +
 +
* The effect on start counter rates of the move needs to be studied. We have scalar data for GlueX running in the EPICS archive. A test might be necessary to accurately assess the change. Simulation may give an answer as well.
 +
* Tim pointed out that it might be possible to lengthen the aluminum tube the connects holds the start counter and connects it mechanically to the target assembly. Igal pointed out that such an extension would need slots for cable penetration.
 +
 +
=== Start Counter Use in the Upcoming Run ===
 +
 +
Beni pointed out that we need to find out if PrimEx and/or SRC have any plans for using the start counter.

Latest revision as of 13:06, 10 June 2021

GlueX Start Counter Meeting
Thursday, June 10, 2021
10:00 am EDT
BlueJeans: 556 286 544

Agenda

  1. Announcements
  2. Review of minutes from the last meeting
  3. Resolution and Calibration
  4. New mounting design for Start Counter (Igal)
  5. Action Item Review

Minutes

Present: Eugene Chudakov, Sean Dobbs, Mark Ito (chair), Igal Jaegle, Simon Taylor, Tim Whitlatch, Beni Zihlmann

There is a recording of this meeting on the BlueJeans site. Use your JLab credentials to gain access.

Review of minutes from the last meeting

We went over the minutes from the meeting on March 18. In response to his inquiries, Mark received the Purchase Requisition for the Start Counter SiPMs from Sasha Somov and the specs of the devices from Fernando Barbosa.

New mounting design for Start Counter

Igal presented an idea for mounting a new μRWELL detector outside the scattering chamber but inside the start counter to give better spatial resolution near the event vertex. He has been working with Simon Taylor, Sean Dobbs, Sergey Furletov, Stuart Ferguson[?], and Kondo Gnanvo. He focused on mechanical design considerations in his presentation. The current configuration of the start counter/target region would not accommodate cables for the detector. Igal proposes moving the start counter 15 cm downstream with respect to the target to open up space for cable penetrations. See his slides for the details.

From the discussion:

  • The effect on start counter rates of the move needs to be studied. We have scalar data for GlueX running in the EPICS archive. A test might be necessary to accurately assess the change. Simulation may give an answer as well.
  • Tim pointed out that it might be possible to lengthen the aluminum tube the connects holds the start counter and connects it mechanically to the target assembly. Igal pointed out that such an extension would need slots for cable penetration.

Start Counter Use in the Upcoming Run