Difference between revisions of "GlueX Start Counter Meeting, August 25, 2011"

From GlueXWiki
Jump to: navigation, search
(notes as minutes)
(Minutes)
Line 36: Line 36:
 
=Minutes=
 
=Minutes=
  
start counter meeting minutes
+
Present:
 
+
* '''FIU''': Werner Boeglin, Lei Guo
Present
+
* '''JLab, CEBAF Center''': Simon Taylor, Beni Zihlmann
 +
* '''JLab, ARC''': Chuck Hutton, Mark Ito (chair), Puneet Khetarpal
  
 
thu 10 am
 
thu 10 am

Revision as of 16:32, 26 August 2011

Location, Time

Thursday, August 25, 2011
3:30 pm EDT
JLab: CEBAF Center, Room F326/7

Agenda

  1. Announcements
  2. Review minutes from previous meeting: all
  3. Prototype Report
    • New SiPM pre-amp
  4. MOU status

Communication Information

Telephone

To connect by telephone:

  1. dial:
  2. enter access code followed by the # sign: 3421244#

Video Conferencing

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2011-3Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2011-3Q/ . You have to be a member of the "halld" Unix group to do this.

Minutes

Present:

  • FIU: Werner Boeglin, Lei Guo
  • JLab, CEBAF Center: Simon Taylor, Beni Zihlmann
  • JLab, ARC: Chuck Hutton, Mark Ito (chair), Puneet Khetarpal

thu 10 am

• tried out, lguth guide with fiber a bit worse than solid light guide • heard about Fernando's SiPM ∘ sent to Fernando ∘ sent back ∘ got everything set up yesterday • 350 ps, worst bar from plastic craft • butted against scintillator • array, no cooling • make small short light guide match to area • start characterizing performance of scintillator paddles ∘ surfaces do not look that nice ∘ surface important • fernando asked how many photo-electrons ∘ 25-35 10 inches away, in the middle • Tim has drawing • MOU stuck in legal, will be expedited • ESR material, five big sheets ∘ has two sides ‣ glue backing • puneet, working with Sascha with reconstruction