Difference between revisions of "GlueX Offline Meeting, November 28, 2012"

From GlueXWiki
Jump to: navigation, search
(Data Challenge Ststus)
(Announcements)
Line 42: Line 42:
  
 
* We decided to set January 1, 2013 as the cut-off date for calibration constant changes to the file-based system, stored in the Subversion repository. After that changes will have to be entered into the calibration database (CCDB).
 
* We decided to set January 1, 2013 as the cut-off date for calibration constant changes to the file-based system, stored in the Subversion repository. After that changes will have to be entered into the calibration database (CCDB).
 
+
* To get to the computers in the counting house via ssh, you must first log into a gateway node hallgw.jlab.org. You will need a two-factor authentication token to do that.
 
+
* There is a plan to use an EVIO dat source and read it into Jana via an ET ring on the node in the counting house. There is also a plan to add farm management to the system.
computers in counting house
+
2-factor necessary to get to gateway
+
 
+
evio -et data source for jana, hddm file, conveert to evio, take to counting house read from et
+
 
+
will add farm management
+
  
 
==Review of Minutes from Last Meeting==
 
==Review of Minutes from Last Meeting==

Revision as of 18:26, 28 November 2012

GlueX Offline Software Meeting
Wednesday, November 28, 2012
1:30 pm EST
JLab: ARC 428

Agenda

  1. Announcements
  2. Review of minutes from the last meeting: all
  3. Reconstruction sub-group reports
    1. Calorimeters
    2. Tracking
    3. PID
  4. Data Challenge Status
    1. Report from the last Data Challenge Meeting
    2. Details of the configuration
  5. Action Item Review
  6. Review of recent repository activity: all

Communication Information

Video Conferencing

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2012-4Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-4Q/ .

Minutes

Present:

  • CMU: Paul Mattione, Curtis Meyer
  • JLab: Mark Ito (chair), David Lawrence, Dmitry Romanov, Sascha Somov, Simon Taylor, Elliott Wolin

Announcements

  • We decided to set January 1, 2013 as the cut-off date for calibration constant changes to the file-based system, stored in the Subversion repository. After that changes will have to be entered into the calibration database (CCDB).
  • To get to the computers in the counting house via ssh, you must first log into a gateway node hallgw.jlab.org. You will need a two-factor authentication token to do that.
  • There is a plan to use an EVIO dat source and read it into Jana via an ET ring on the node in the counting house. There is also a plan to add farm management to the system.

Review of Minutes from Last Meeting

Tracking Report

tracking, propagating covarianve matrix along trajectory cdc geometry broken, in process of fixing bcal geometry, readout box masking some of the material

comments about conceptual subtleties

Data Challenge Ststus

ask for cpus on farm, submitr jobs by this afternoon make a tagged release

Geometry Query Tool

geometry, look at geometry, charged pion polarizability, differnt target locations, iefficiency when target moved back material tool for locating space point within the geometry

ROOT-based Event Display

started working on EVE