Difference between revisions of "GlueX Data Challenge Meeting, February 14, 2014"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 17: Line 17:
 
#* Running jobs at MIT Justin
 
#* Running jobs at MIT Justin
 
#** 100 jobs with 10K events each, no EM background: only 2 failed (with DTrackFitterKalmanSIMD)  
 
#** 100 jobs with 10K events each, no EM background: only 2 failed (with DTrackFitterKalmanSIMD)  
 +
#* 100-job tests at various sites. [[Quick Look at DC 2|Jlab]]/Grid/CMU,NWU, ....
 
#* Electromagnetic Backgrounds update.  Paul/[https://halldweb1.jlab.org/wiki/images/6/6e/2014-02-14-DC2-Moriya.pdf Kei]
 
#* Electromagnetic Backgrounds update.  Paul/[https://halldweb1.jlab.org/wiki/images/6/6e/2014-02-14-DC2-Moriya.pdf Kei]
 
#* Check on event genealogy. Kei
 
#* Check on event genealogy. Kei
 
#* Preparations of standard distribution/scripts Mark/Richard/Sean
 
#* Preparations of standard distribution/scripts Mark/Richard/Sean
 
#* Report on data management practices - Sean -  
 
#* Report on data management practices - Sean -  
#* 100-job tests at various sites. [[Quick Look at DC 2|Jlab]]/Grid/CMU,NWU, ....
 
 
# Proposed Schedule
 
# Proposed Schedule
 
#* Launch of Data Challenge Thursday Feb.27, 2014 (est.).
 
#* Launch of Data Challenge Thursday Feb.27, 2014 (est.).

Revision as of 12:32, 14 February 2014

GlueX Data Challenge Meeting
Friday, February 14, 2014
11:00 pm, EST
JLab: CEBAF Center, L207
ESNet: 8542553
ReadyTalk: (866)740-1260, access code: 1833622
ReadyTalk desktop: http://esnet.readytalk.com/ , access code: 1833622

Agenda

  1. Announcements
  2. Status of Preparations
    • Update on phi=0 geometry issues in CDC? Solved?
    • Random number seeds procedure? Mark/Anyone
    • Running jobs at CMU Paul
    • Running jobs at NU Sean
    • Running jobs at MIT Justin
      • 100 jobs with 10K events each, no EM background: only 2 failed (with DTrackFitterKalmanSIMD)
    • 100-job tests at various sites. Jlab/Grid/CMU,NWU, ....
    • Electromagnetic Backgrounds update. Paul/Kei
    • Check on event genealogy. Kei
    • Preparations of standard distribution/scripts Mark/Richard/Sean
    • Report on data management practices - Sean -
  3. Proposed Schedule
    • Launch of Data Challenge Thursday Feb.27, 2014 (est.).
    • Test jobs going successfully by Tuesday February 25.
    • Distribution ready by Monday February 24.
  4. AOT

Minutes

Present: