Difference between revisions of "GlueX-II and DIRC ERR"

From GlueXWiki
Jump to: navigation, search
(Monday June 25, 2018)
 
(44 intermediate revisions by 5 users not shown)
Line 1: Line 1:
 
Experimental Readiness Review for Gluex-II high intensity and the DIRC
 
Experimental Readiness Review for Gluex-II high intensity and the DIRC
  
== Monday June 25, 2018 ==
+
== Monday June 25, 2018 (F326) ==
 
* [[Media:DIRC_GlueX-II_ERR_Charge.pdf|Charge]]
 
* [[Media:DIRC_GlueX-II_ERR_Charge.pdf|Charge]]
  
Line 12: Line 12:
 
*: Javier Gomez (observer)
 
*: Javier Gomez (observer)
  
* Agenda (Preliminary)
+
* Agenda
 
** 08:30-08:45 Executive session
 
** 08:30-08:45 Executive session
** 08:45-09:30 ''DIRC project: overview and status'' (charge 2,4-6; 30+15 min) -- Justin Stevens  
+
** 08:45-09:30 [https://halldweb.jlab.org/DocDB/0036/003653/007/dirc_err_stevens.pdf ''DIRC project: overview and status''] (charge 2,4-6; 30+15 min) -- Justin Stevens  
** 09:30-10:15 ''DIRC installation schedule and EHS&Q'' (charge 1,3,4-6; 30+15 min) --  Tim Whitlatch
+
** 09:30-10:15 [[Media:ERR_DIRC_2018_twv2.pdf |''DIRC installation Plans'']] (charge 1,3,4-6; 30+15 min) --  Tim Whitlatch
 
** 10:15-10:45 Coffee break
 
** 10:15-10:45 Coffee break
** 10:45-11:45 ''GlueX at high intensity'' (charge 7-8; 40+20 min) -- David Lawrence
+
** 10:45-11:45 [https://docs.google.com/presentation/d/1IKV6q7keQoBki6TkJQJd9zvD3FctCC7NkN8T2qUTRN8/edit?usp=sharing ''GlueX at high intensity''] ([[Media:20160225_lawrence_ERR.pdf|PDF]])(charge 7-8; 40+20 min) -- David Lawrence
 
** 11:45-14:30 Lunch + Executive session
 
** 11:45-14:30 Lunch + Executive session
** 14:30 Closeout
+
** 14:30 Closeout - [[Media:GlueX-II_ERR_Closeout_report.pdf | Report]]
 
+
* [[Media:GlueX-II_ERR_Final_report.pdf | Final Report]]
 +
** [[Addressing ERR review recommendations]]
 
* Proposals and reviews:
 
* Proposals and reviews:
 
** [https://www.jlab.org/exp_prog/proposals/13/PR12-13-003.pdf Approved proposal from PAC40 (High Intensity)]
 
** [https://www.jlab.org/exp_prog/proposals/13/PR12-13-003.pdf Approved proposal from PAC40 (High Intensity)]
Line 27: Line 28:
 
** [[May_11_High_Intensity_Review | High Intensity Review (May 2017) ]]
 
** [[May_11_High_Intensity_Review | High Intensity Review (May 2017) ]]
 
* Pre-brief material:
 
* Pre-brief material:
 +
** [https://halldweb.jlab.org/wiki/images/e/e7/COO.pdf COO]
 +
** [https://halldweb.jlab.org/wiki/images/2/23/HallD_ESAD_v2.pdf ESAD]
 +
** [https://halldweb.jlab.org/wiki/images/6/6b/Operational_safety_procedure_form_76940.pdf OSP]
 +
** [https://www.jlab.org/Hall-D/safety-docs/current/ERG.pdf ERG] (will add DIRC to drawings)
 
** [https://halldweb.jlab.org/hdops/wiki/index.php/DIRC_Shift Documentation for Shift Takers]
 
** [https://halldweb.jlab.org/hdops/wiki/index.php/DIRC_Shift Documentation for Shift Takers]
 
** [[Media:Nitrogen_P&ID.pdf|Nitrogen system P&I Diagram]]
 
** [[Media:Nitrogen_P&ID.pdf|Nitrogen system P&I Diagram]]
 +
** [[Media:Water_P&ID.pdf|DIRC Water system P&I Diagram]]
 
** [[Media:Water_Skid_operations.pdf|DIRC Pure water skid operations manual]]
 
** [[Media:Water_Skid_operations.pdf|DIRC Pure water skid operations manual]]
 
** [[Media:DIRC_Install.pdf|DIRC Installation Drawing]]
 
** [[Media:DIRC_Install.pdf|DIRC Installation Drawing]]
** [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3521 Optical Box Alignment strawman] (Tim)
 
 
** [[Media:Optical_box_laser_fiducialization.pdf|DIRC Laser fiducialization procedure]]
 
** [[Media:Optical_box_laser_fiducialization.pdf|DIRC Laser fiducialization procedure]]
 +
** [[Media:DIRC_Install_Schedule_lateOB.pdf|DIRC Installation Schedule]]
 
* Safety documentation
 
* Safety documentation
 
** [http://devweb.acc.jlab.org/CSUEApps/hdlist/task/1521 HDList for DIRC Installation]
 
** [http://devweb.acc.jlab.org/CSUEApps/hdlist/task/1521 HDList for DIRC Installation]
** Computing requirements
+
** [http://devweb.acc.jlab.org/CSUEApps/hdlist/task/1518 HDList for DIRC Installation tool]
 +
** [[Media:DIRC_Critical_lift.pdf|DIRC Bar Box Critical Lift Installation Plan]]
 +
** [[Media:DIRC_Water_PS1_Form.pdf|DIRC Water System Pressure System form PS1]]
 +
** [[Media:DIRC_Water_System_stored_energy.pdf|DIRC water system stored energy calc]]
 +
** [[Media:DIRC_Support_Structure_Analysis.pdf|DIRC Support Structure Analysis]]
 +
** [[Media:DIRC_BarBox_Frame_Structure_Analysis.pdf|DIRC Bar Box Support Frame Structure Analysis]]
 +
* Computing requirements
 +
** [https://github.com/JeffersonLab/hd_utilities/tree/master/comp_mod Computing Model] (github)
 +
*** [https://github.com/JeffersonLab/hd_utilities/blob/master/comp_mod/RunPeriod-2017-01.xml RunPeriod-2017-01 model inputs]
 +
*** [https://github.com/JeffersonLab/hd_utilities/blob/master/comp_mod/HighIntensity_Projection.xml High Intensity model inputs]
 +
*** [https://halldweb.jlab.org/DocDB/0036/003689/002/level1_06_22_2018.pdf Performance of L1 at high rate ]

Latest revision as of 15:55, 11 January 2019

Experimental Readiness Review for Gluex-II high intensity and the DIRC

Monday June 25, 2018 (F326)

  • Reviewers
    Graham Heyes (chair)
    Todd Averett
    Amber Boehnlein
    Ed Folts
    Valery Kubarovsky
    Javier Gomez (observer)