Difference between revisions of "GlueX-Collaboration-Jan-2008"

From GlueXWiki
Jump to: navigation, search
(Friday January 11, 2008)
m (Text replacement - "http://argus.phys.uregina.ca/cgi-bin/private" to "https://halldweb.jlab.org/doc-private")
 
(13 intermediate revisions by 4 users not shown)
Line 14: Line 14:
 
[http://www.jlab.org/Hall-D/meetings/coll_jan2008/Registration/Register.php Registration Page]
 
[http://www.jlab.org/Hall-D/meetings/coll_jan2008/Registration/Register.php Registration Page]
  
== Talks that don't fit into the following schedule. ==
+
== Location ==
  
  Please add talks that do not fit the schedule here
+
Room L102/104<br>
 +
CEBAF Center<br>
 +
Jefferson Lab
 +
 
 +
== Talks on the DocDB ==
 +
 
 +
https://halldweb.jlab.org/doc-private/DocDB/DisplayMeeting?conferenceid=17
  
 
== Thursday January 10, 2008 ==
 
== Thursday January 10, 2008 ==
Line 35: Line 41:
 
* Session IIa Offline and Simulation  --- Chair Paul Eugenio  
 
* Session IIa Offline and Simulation  --- Chair Paul Eugenio  
 
** 1:15 Status of simulation (25) --- Richard
 
** 1:15 Status of simulation (25) --- Richard
 +
*** action item: create a wiki page with all the things to change with respect to the current CD-3 geometry
 +
**** start counter
 +
**** route FDC cable to come out at the upstream side
 
** 1:45 Offline Sofware Status (15) --- David L.
 
** 1:45 Offline Sofware Status (15) --- David L.
 
** 2:00 Tracking Reconstruction (25) --- David L./Simon/Mark
 
** 2:00 Tracking Reconstruction (25) --- David L./Simon/Mark
Line 40: Line 49:
 
* Session IIb Online and Electronics
 
* Session IIb Online and Electronics
 
** 3:15 Electronics  (45 min)  Fernando Barbosa   
 
** 3:15 Electronics  (45 min)  Fernando Barbosa   
** 4:00 Status of the online/DAQ (15) --- Elliott
+
** 4:00 Status of the Trigger/DAQ/Monitoring/Controls effort (15) --- Elliott
 
** 4:20 Status of the trigger (20) --- Dave D.
 
** 4:20 Status of the trigger (20) --- Dave D.
  
Line 46: Line 55:
  
 
* Session IIIa (Calorimeter)    --- Chair David Lawrence
 
* Session IIIa (Calorimeter)    --- Chair David Lawrence
** 09:00 BCAL: Beam test analysis (15 min) --- Blake
+
** 09:00 BCAL Progress Update (30 min) --- George
** 09:30 BCAL: SiPM/Cosmics Tests (25 min) --- George/Andrei
+
*** analyse cosmic spectra from green and blue fibers, to varify the factor 5 in light yield
** 10:15 BCAL: Monte Carlo (10 min) --- Zisis
+
** 09:30 Discussion on no of photoelectrons and implication on SiPMs
 
** 10:00 FCAL: Threshold/Light guides/FADC (20 min) --- Beni/Matt
 
** 10:00 FCAL: Threshold/Light guides/FADC (20 min) --- Beni/Matt
 
* 10:30 Coffee Break
 
* 10:30 Coffee Break
 
* Session IIIb --- Chair Elke Aschenauer
 
* Session IIIb --- Chair Elke Aschenauer
 
** 10:50 Reconstruction/Physics (20 min) --- Mihajlo/Matt
 
** 10:50 Reconstruction/Physics (20 min) --- Mihajlo/Matt
 +
*** the following plots are needed for the review
 +
**** compare CD-3 geometry with the on for chamber review
 +
**** put fdc cables to zero and compare with cd-3 geometry
 
** 11:15 Calorimeter Transition Region (15 min) --- Richard/Paul
 
** 11:15 Calorimeter Transition Region (15 min) --- Richard/Paul
 +
**** get a cost estimate for the GCal
 +
**** for the calo-review we leave things where they are right now
 +
**** write CR to remove UPV from R&D and PED
 
** 11:40 Calorimetry Review (25 min) --- Elton/Zisis
 
** 11:40 Calorimetry Review (25 min) --- Elton/Zisis
 
*** Document status
 
*** Document status
Line 63: Line 78:
 
** 13:15 CDC (20) Yves Van Haarlem
 
** 13:15 CDC (20) Yves Van Haarlem
 
** 13:50 FDC (20) Simon Taylor
 
** 13:50 FDC (20) Simon Taylor
 +
*** Action items:
 +
**** investigate the impact routing the cables out at the CDC side on cable lenght, shaping, space for electronics location and cdc layers
 
** 14:25 Preamps (20) Fernando Barbosa
 
** 14:25 Preamps (20) Fernando Barbosa
 
** 14:55 Tracking Review (20) Daniel Carman
 
** 14:55 Tracking Review (20) Daniel Carman
Line 79: Line 96:
 
* Session Va  Chair --- George Lolos
 
* Session Va  Chair --- George Lolos
 
** 9:00 Report from the Collaboration Board
 
** 9:00 Report from the Collaboration Board
** 9:45 DIRC Discussion
+
** 9:45 [http://www.jlab.org/~marki/slac-pub-10516.pdf DIRC] Discussion
 
*** Impact of leaving space for a DIRC
 
*** Impact of leaving space for a DIRC
 
*** Impact of DIRC Readout
 
*** Impact of DIRC Readout
 +
---> Decission was made to leave no space for a DIRC
 
** 10:15 Physics Workshop Update --- Curtis Meyer
 
** 10:15 Physics Workshop Update --- Curtis Meyer
 +
*** http://conferences.jlab.org/php2008/index.html
 +
*** all the collaboration members should invite people to the workshop
 +
*** add page to spires conferences ---> done
 +
*** add link to JLab calendar ----> request placed
 
** 11:00 Closeout --- Curtis Meyer
 
** 11:00 Closeout --- Curtis Meyer
 
*** Weekly Meeting
 
*** Weekly Meeting
 +
**** we will have our weekely meeting now bi-weekley on We. 10.00 am
 
*** Next two collaboration meetings
 
*** Next two collaboration meetings

Latest revision as of 17:00, 24 February 2017

GlueX Collaboration Meeting

 January 10, 11 an 12, 2008 at Jefferson Lab
 The following template has been set up to allow people to identify what needs to be presented 
 at the meeting. It has been roughly broken out by working group with suggestions for topics 
 within each group. The working group chairs should work on adding the relevant talks with an 
 estimated time (including questions) and the speaker's name. If there is a talk that does not 
 fit into this template, please add it at the bottom. 

Registration

Everyone participating in the collaboration meeting whether in person at JLab or remotely via electronic media are encouraged to register. One can register on the Registration Page

Location

Room L102/104
CEBAF Center
Jefferson Lab

Talks on the DocDB

https://halldweb.jlab.org/doc-private/DocDB/DisplayMeeting?conferenceid=17

Thursday January 10, 2008

  • Session Ia --- Opening --- Chair Alex Dzierba
    • 09:00 Welcome (15 min) Curtis Meyer
    • 09:15 Update on Project Status (30 min) Elke Aschenauer
    • 09:45 Upcoming Reviews (30 min) Elton Smith
  • 10:15 Coffee Break
  • Session Ib Infrastructure and Beam --- Chair Elton Smith
    • 10:30 Engineering and Design (30 min) Tim Whitlatch
    • 11:00 Magnet Update (30 min) George B.
    • 11:30 Tagger Bid Package
    • 11:45 Beamline specifications
      • Need to sign them in agreement with JLab machine group.
      • Any other requirement to the machine group.
  • 12:15 Lunch
  • Session IIa Offline and Simulation --- Chair Paul Eugenio
    • 1:15 Status of simulation (25) --- Richard
      • action item: create a wiki page with all the things to change with respect to the current CD-3 geometry
        • start counter
        • route FDC cable to come out at the upstream side
    • 1:45 Offline Sofware Status (15) --- David L.
    • 2:00 Tracking Reconstruction (25) --- David L./Simon/Mark
  • 2:45 Coffee Break
  • Session IIb Online and Electronics
    • 3:15 Electronics (45 min) Fernando Barbosa
    • 4:00 Status of the Trigger/DAQ/Monitoring/Controls effort (15) --- Elliott
    • 4:20 Status of the trigger (20) --- Dave D.

Friday January 11, 2008

  • Session IIIa (Calorimeter) --- Chair David Lawrence
    • 09:00 BCAL Progress Update (30 min) --- George
      • analyse cosmic spectra from green and blue fibers, to varify the factor 5 in light yield
    • 09:30 Discussion on no of photoelectrons and implication on SiPMs
    • 10:00 FCAL: Threshold/Light guides/FADC (20 min) --- Beni/Matt
  • 10:30 Coffee Break
  • Session IIIb --- Chair Elke Aschenauer
    • 10:50 Reconstruction/Physics (20 min) --- Mihajlo/Matt
      • the following plots are needed for the review
        • compare CD-3 geometry with the on for chamber review
        • put fdc cables to zero and compare with cd-3 geometry
    • 11:15 Calorimeter Transition Region (15 min) --- Richard/Paul
        • get a cost estimate for the GCal
        • for the calo-review we leave things where they are right now
        • write CR to remove UPV from R&D and PED
    • 11:40 Calorimetry Review (25 min) --- Elton/Zisis
      • Document status
      • Materials to Reviewers
      • List of questions to prepare for
  • 12:15 Lunch
  • Session IVa Tracking --- Chair Matt Shepherd
    • 13:15 CDC (20) Yves Van Haarlem
    • 13:50 FDC (20) Simon Taylor
      • Action items:
        • investigate the impact routing the cables out at the CDC side on cable lenght, shaping, space for electronics location and cdc layers
    • 14:25 Preamps (20) Fernando Barbosa
    • 14:55 Tracking Review (20) Daniel Carman
  • 15:15 Coffee
  • Session IVb (Discussion on Work to be Done) --- Chair Curtis Meyer
    • 15:45 (60)
      • Detector Specifications (Elton's Document)
      • Action Item Tracker
      • Design Report Update --- Alex
  • 17:00 Collaboration Board Meeting

Saturday January 12, 2008

  • Session Va Chair --- George Lolos
    • 9:00 Report from the Collaboration Board
    • 9:45 DIRC Discussion
      • Impact of leaving space for a DIRC
      • Impact of DIRC Readout

---> Decission was made to leave no space for a DIRC

    • 10:15 Physics Workshop Update --- Curtis Meyer
    • 11:00 Closeout --- Curtis Meyer
      • Weekly Meeting
        • we will have our weekely meeting now bi-weekley on We. 10.00 am
      • Next two collaboration meetings