Difference between revisions of "GlueX-Collaboration-Jan-2008"

From GlueXWiki
Jump to: navigation, search
(Thursday January 10, 2008)
(Thursday January 10, 2008)
Line 19: Line 19:
 
** 09:15 Update on Project Status (30 min) Elke Aschenauer
 
** 09:15 Update on Project Status (30 min) Elke Aschenauer
 
** 09:45 Upcoming Reviews (30 min) Elton Smith
 
** 09:45 Upcoming Reviews (30 min) Elton Smith
 
+
* 10:15 Coffee Break
* Coffee Break
+
** 10:15  
+
 
+
 
* Session Ib Infrastructure  --- Chair Elton Smith
 
* Session Ib Infrastructure  --- Chair Elton Smith
 
** 10:30 Magnet Updates (30 min)                George  B.
 
** 10:30 Magnet Updates (30 min)                George  B.
 
** 11:00 The Hall
 
** 11:00 The Hall
** 11:30 Electronics  (45 min)  Fernando Barbosa                          
+
** 11:30 Electronics  (45 min)  Fernando Barbosa
 
+
* 12:15 Lunch
* Lunch
+
** 12:15  
+
 
+
 
* Session IIa (Beamline and Tagger)  --- Chair George Lolos
 
* Session IIa (Beamline and Tagger)  --- Chair George Lolos
 
** 1:15 Bid Package
 
** 1:15 Bid Package
Line 36: Line 30:
 
*** Need to sign them in agreement with JLab machine group.  
 
*** Need to sign them in agreement with JLab machine group.  
 
*** Any other requirement to the machine group.
 
*** Any other requirement to the machine group.
 
 
* Session IIb Online and Offline  --- Chair Paul Eugenio  
 
* Session IIb Online and Offline  --- Chair Paul Eugenio  
** Monte Carlo
+
** 2:15 Status of simulation (25) --- Richard
*** 2:15 Status of simulation (25) --- Richard
+
** 2:45 Offline Sofware Status (15) --- David L.
** 2:45 Offline Sofware Status (15) --- David L.
+
* 3:15 Coffee Break
 
+
** 3:30 Status of the online/DAQ (15) --- Elliott
* Coffee Break
+
** 4:00 Status of the trigger (20) --- Dave D.
** 3:15
+
 
+
** Online and DAQ
+
*** 3:30 Status of the online/DAQ (15) --- Elliott
+
*** 4:00 Status of the trigger (20) --- Dave D.
+
  
 
== Friday January 11, 2008 ==   
 
== Friday January 11, 2008 ==   

Revision as of 12:52, 1 January 2008

GlueX Collaboration Meeting

 January 10, 11 an 12, 2008 at Jefferson Lab
 The following template has been set up to allow people to identify what needs to be presented 
 at the meeting. It has been roughly broken out by working group with suggestions for topics 
 within each group. The working group chairs should work on adding the relevant talks with an 
 estimated time (including questions) and the speaker's name. If there is a talk that does not 
 fit into this template, please add it at the bottom. 

Talks that don't fit into the following schedule.

 Please add talks that do not fit the schedule here

Thursday January 10, 2008

  • Session Ia --- Opening --- Chair Alex Dzierba
    • 09:00 Welcome (15 min) Curtis Meyer
    • 09:15 Update on Project Status (30 min) Elke Aschenauer
    • 09:45 Upcoming Reviews (30 min) Elton Smith
  • 10:15 Coffee Break
  • Session Ib Infrastructure --- Chair Elton Smith
    • 10:30 Magnet Updates (30 min) George B.
    • 11:00 The Hall
    • 11:30 Electronics (45 min) Fernando Barbosa
  • 12:15 Lunch
  • Session IIa (Beamline and Tagger) --- Chair George Lolos
    • 1:15 Bid Package
    • 1:45 Beam specifications
      • Need to sign them in agreement with JLab machine group.
      • Any other requirement to the machine group.
  • Session IIb Online and Offline --- Chair Paul Eugenio
    • 2:15 Status of simulation (25) --- Richard
    • 2:45 Offline Sofware Status (15) --- David L.
  • 3:15 Coffee Break
    • 3:30 Status of the online/DAQ (15) --- Elliott
    • 4:00 Status of the trigger (20) --- Dave D.

Friday January 11, 2008

  • Session IIa (Calorimeter) --- Chair David Lawrence
    • BCAL (50 min)
      • Beam test analysis (15 min) --- Blake
      • SiPM/Cosmics Tests (25 min) --- George/Andrei
      • Monte Carlo (10 min) --- Zisis
    • FCAL (40 min)
      • Threshold/Light guides/FADC (20 min) --- Beni/Matt
      • Reconstruction/Physics (20 min) --- Mihajlo/Matt
    • Calorimeter Transition Region (15 min) --- Richard/Paul
    • Calorimetry Review (25 min) --- Elton/Zisis
      • Document status
      • Materials to Reviewers
      • List of questions to prepare for


  • Session IIIb Tracking --- Chair Matt Shepherd
    • CDC (20) Yves VanHaarlem
    • FDC (20) Simon Taylor
    • Preamps (20) Fernando Barbosa
    • Tracking Reconstruction (25) --- David L./Simon/Mark
    • Tracking Review (20) Dan Carman
  • Lunch
  • Session IVa (Discussion on Work to be Done) --- Chair Curtis Meyer
    • Detector Specifications (Elton's Document)
    • Action Item Tracker
  • Collaboration Board Meeting

Saturday January 12, 2008

  • Session Va Chair ---
    • Report from the Collaboration Board
    • DIRC Discussion
      • Impact of leaving space for a DIRC
      • Impact of DIRC Readout
    • Design Report Update
    • Physics Workshop Update
    • Closeout