Feb. 22, 2008 Tracking CDC/FDC

From GlueXWiki
Revision as of 11:42, 22 February 2008 by Staylor (Talk | contribs) (Agenda)

Jump to: navigation, search

Agenda

  1. Status of MC resolution studies (David)
  2. EM Background rates (David)
  3. Status of Kinematic Fitting (Matt)
    1. Signal Leakage in pi/K (new studies) pi/K Separation (GlueX doc-971)
    2. Previous talk pi/K Separation (GlueX doc-971)
  4. Status of PWA anchoring (Paul, Alexander)
    1. BNL-E852 tracking resolutions
      1. Pos-Res
      2. Neg-Res
    2. Three pi resonance generation & simulation
      1. gamma p -> a2(1320) n [pdf file]
      2. gamma p > X n where X contains: a1(1170), a2(1320), pi2(1670), pi1(1600) [pdf file]
      3. rebirth of pwa simulations
  5. DC and PID Review Schedule for preparations (Elton)
  6. CDC Hardware Status 22 February 2008
  7. FDC Hardware Status
  8. Update on segment-based track finding [1]

Participating

Location

The meeting will be at 11:00am in Cebaf Center F324-325.

Telephone

To connect by telephone: 1.) dial:

800-377-8846 : US
888-276-7715 : Canada
302-709-8424 : International (not a free call!)

2.) enter participant code: 39527048# (remember the "#")

Video Conferencing

The room at JLab does not have video conferencing equipment installed.


Minutes

Attendees: TBD