Difference between revisions of "Feb. 22, 2008 Tracking CDC/FDC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 6: Line 6:
 
## Signal Leakage in pi/K (new studies) [http://argus.phys.uregina.ca/gluex/DocDB/0009/000971/002/Bellis_piKseparation_II.pdf pi/K Separation (GlueX doc-971)]  
 
## Signal Leakage in pi/K (new studies) [http://argus.phys.uregina.ca/gluex/DocDB/0009/000971/002/Bellis_piKseparation_II.pdf pi/K Separation (GlueX doc-971)]  
 
## Previous talk [http://argus.phys.uregina.ca/gluex/DocDB/0009/000971/002/Bellis_piKseparation.pdf pi/K Separation (GlueX doc-971)]  
 
## Previous talk [http://argus.phys.uregina.ca/gluex/DocDB/0009/000971/002/Bellis_piKseparation.pdf pi/K Separation (GlueX doc-971)]  
# Status of PWA anchoring (Paul, Alexander?)
+
# Status of PWA anchoring (Paul, Alexander)
 
##BNL-E852 tracking resolutions
 
##BNL-E852 tracking resolutions
 +
###[http://www.jlab.org/~ostrov/e852resol_pos.gif Pos-Res]
 +
###[http://www.jlab.org/~ostrov/e852resol_neg.gif Neg-Res]
 
##Three pi resonance generation & simulation
 
##Three pi resonance generation & simulation
 
###[http://www.jlab.org/Hall-D/software/wiki/images/b/bc/A2_plots.jpg  gamma p -> a2(1320) n] [[http://www.jlab.org/Hall-D/software/wiki/images/d/d8/A2_plots.pdf pdf file]]
 
###[http://www.jlab.org/Hall-D/software/wiki/images/b/bc/A2_plots.jpg  gamma p -> a2(1320) n] [[http://www.jlab.org/Hall-D/software/wiki/images/d/d8/A2_plots.pdf pdf file]]

Revision as of 11:42, 22 February 2008

Agenda

  1. Status of MC resolution studies (David)
  2. EM Background rates (David)
  3. Status of Kinematic Fitting (Matt)
    1. Signal Leakage in pi/K (new studies) pi/K Separation (GlueX doc-971)
    2. Previous talk pi/K Separation (GlueX doc-971)
  4. Status of PWA anchoring (Paul, Alexander)
    1. BNL-E852 tracking resolutions
      1. Pos-Res
      2. Neg-Res
    2. Three pi resonance generation & simulation
      1. gamma p -> a2(1320) n [pdf file]
      2. gamma p > X n where X contains: a1(1170), a2(1320), pi2(1670), pi1(1600) [pdf file]
      3. rebirth of pwa simulations
  5. DC and PID Review Schedule for preparations (Elton)
  6. CDC Hardware Status 22 February 2008
  7. FDC Hardware Status

Participating

Location

The meeting will be at 11:00am in Cebaf Center F324-325.

Telephone

To connect by telephone: 1.) dial:

800-377-8846 : US
888-276-7715 : Canada
302-709-8424 : International (not a free call!)

2.) enter participant code: 39527048# (remember the "#")

Video Conferencing

The room at JLab does not have video conferencing equipment installed.


Minutes

Attendees: TBD