Fall 2014 Commissioning Simulations
From GlueXWiki
Revision as of 23:17, 11 August 2014 by Sdobbs (Talk | contribs) (Created page with "__TOC__ ==Overview== This page is for the organization and sharing of information about simulations for the Fall 2014 Commissioning data. ===General Info=== * [https://hdops....")
Contents
Overview
This page is for the organization and sharing of information about simulations for the Fall 2014 Commissioning data.
General Info
To Do Items
- Incoherent beam in bggen
- Commissioning target geometry in HDDS/sim-recon
- Confirm that the simulation of EM background in HDGeant is
- What gate should be used?
Conditions
- New tagged sim-recon release?
- Other software versions
- Solenoid @ 1200 A
- Unpolarized photon beam <10 MHz/GeV at the endpoint
EM Background Simulations
- What is the background rate with no target?
- What is the background rate with various targets?
Hadronic Event Simulations
Overall hadronic rate
Reference: Fall 2014 Commissioning Plan
Assume 50 nA CW electron beam
1.5 µm Al | 10 µm Al | 30 µm Al | |
10mm CH2 | |||
2mm CH2 | |||
2/7mm CH2 | |||
3.4mm graphite |