(Created page with "__TOC__ ==Overview== This page is for the organization and sharing of information about simulations for the Fall 2014 Commissioning data. ===General Info=== * [https://hdops....")
 
(To Do Items)
Line 13: Line 13:
 
* Incoherent beam in bggen
 
* Incoherent beam in bggen
 
* Commissioning target geometry in HDDS/sim-recon
 
* Commissioning target geometry in HDDS/sim-recon
* Confirm that the simulation of EM background in HDGeant is
+
* Confirm that the simulation of EM background in HDGeant works for this running
 
** What gate should be used?
 
** What gate should be used?
+
* Decide which version of sim-recon should be used
  
 
==Conditions==
 
==Conditions==

Revision as of 23:20, 11 August 2014

Overview

This page is for the organization and sharing of information about simulations for the Fall 2014 Commissioning data.

General Info

To Do Items

  • Incoherent beam in bggen
  • Commissioning target geometry in HDDS/sim-recon
  • Confirm that the simulation of EM background in HDGeant works for this running
    • What gate should be used?
  • Decide which version of sim-recon should be used

Conditions

  • New tagged sim-recon release?
  • Other software versions
  • Solenoid @ 1200 A
  • Unpolarized photon beam <10 MHz/GeV at the endpoint

EM Background Simulations

  • What is the background rate with no target?
  • What is the background rate with various targets?

Hadronic Event Simulations

Overall hadronic rate

Reference: Fall 2014 Commissioning Plan

Assume 50 nA CW electron beam

Hadronic Event Rate
1.5 µm Al 10 µm Al 30 µm Al
10mm CH2
2mm CH2
2/7mm CH2
3.4mm graphite

Special Simulations