[https://halldweb.jlab.org/detectors/fcal2/assembled.pdf Fabricated modules (pre-production)]
 
[https://halldweb.jlab.org/detectors/fcal2/assembled.pdf Fabricated modules (pre-production)]
  
[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf Fabricated modules ]
+
[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/Crystal_inventory_06_23.xlsx Final inventory of fabricated modules ]
  
 +
Fabricated modules:
 +
 +
:: - [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf  CRYTUR ]
 +
:: - [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur_siccas.pdf  SICCAS ]
 
:: -[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf Statistics per week ]
 
:: -[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf Statistics per week ]
  
 
+
[https://halldweb.jlab.org/detectors/fcal2/budget/students2.xlsx Summer Students (2022) ]
[https://halldweb.jlab.org/detectors/fcal2/budget/students1.xlsx Summer Students (2022) ]
+
  
 
[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals (2022) ]
 
[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals (2022) ]
  
 
[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf  Parts for module fabrication ]
 
[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf  Parts for module fabrication ]
 +
 +
[https://halldweb.jlab.org/wiki/index.php/All_modules_(with_SICCAS_crystals)_are_removed Removing SICCAS crystals from CCAL]
  
  
Line 35: Line 40:
 
*[https://halldweb.jlab.org/detectors/CompCal/assembly_procedures/Preshaping.pdf CompCal ESR reflector pre-shaping procedure]
 
*[https://halldweb.jlab.org/detectors/CompCal/assembly_procedures/Preshaping.pdf CompCal ESR reflector pre-shaping procedure]
  
 +
*[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/modules_qa.docx Checklist for quality assessment of modules]
 +
 +
*[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/removing_fcal_cables.docx Removing signal cables from the FCAL]
  
 
[[File:modules.jpg|200px|Assembled modules]]
 
[[File:modules.jpg|200px|Assembled modules]]

Latest revision as of 20:27, 6 August 2023

Task list

Main fabrication steps

Construction schedule

Fabricated modules (pre-production)

Final inventory of fabricated modules

Fabricated modules:

- CRYTUR
- SICCAS
-Statistics per week

Summer Students (2022)

Wrapped CRYTUR crystals (2022)

Parts for module fabrication

Removing SICCAS crystals from CCAL


Procedures:


Assembled modules


Operational Safety Procedure (OSP)