Difference between revisions of "Electronics"

From GlueXWiki
Jump to: navigation, search
(Misc Links)
(Misc Links)
Line 28: Line 28:
 
== Misc Links ==
 
== Misc Links ==
  
* Summary of Hall D Detector Systems (2 April 2008)- Electronics channel counts, etc. maintained by Fernando, GlueX-doc-747 on the [http://argus.phys.uregina.ca/gluex/DocDB/0007/000747/010/HallD%20Detector%20Summary%20422008.pdf GlueX-doc-747]
+
* Summary of Hall D Detector Systems (2 April 2008) - Electronics channel counts, etc. maintained by Fernando, GlueX-doc-747 on the [http://argus.phys.uregina.ca/gluex/DocDB/0007/000747/010/HallD%20Detector%20Summary%20422008.pdf GlueX-doc-747]
  
* Hall D Complex Final Drawings (25 Feb 2008)- From landscaping to electrical details [http://www.jlab.org/Hall-D/gluex_secure/Civil-Drawings&Info/Hall_D_Complex_Final_Dwgs.pdf Hall D Complex]
+
* Hall D Complex Final Drawings (25 Feb 2008) - From landscaping to electrical details [http://www.jlab.org/Hall-D/gluex_secure/Civil-Drawings&Info/Hall_D_Complex_Final_Dwgs.pdf Hall D Complex]
  
 
* Hall D Space Program Design Criteria (July 2007) - Additional construction details [http://www.jlab.org/Hall-D/gluex_secure/Civil-Drawings&Info/Hall_D_Space_Program_Design_Criteria_v2-0.pdf Hall D Complex II]
 
* Hall D Space Program Design Criteria (July 2007) - Additional construction details [http://www.jlab.org/Hall-D/gluex_secure/Civil-Drawings&Info/Hall_D_Space_Program_Design_Criteria_v2-0.pdf Hall D Complex II]

Revision as of 10:01, 3 April 2008

Scope of Electronics Effort

The Electronics Working Group (EWG) is responsible for all the electronics instrumentation in Hall D at Jefferson Lab. The EWG tasks are to:

1. Design, procure and commission all the electronics instrumentation by working in close collaboration with all the detector and support groups and the GlueX collaboration members towards the successful construction and operation of Hall D.

2. Support the R&D efforts for all the detector subsystems.

3. Disseminate information by providing documentation necessary for the successful integration of the detector, instrumentation and readout electronics.

4. Provide for a safe work environment by effectively communicating and implementing all the safety standards and requirements at Jefferson Lab.

  • Site maintained by F.J. Barbosa. For additional information, barbosa@jlab.org or (757) 269-7433

Meetings


Electronics Tasks


Misc Links

  • Summary of Hall D Detector Systems (2 April 2008) - Electronics channel counts, etc. maintained by Fernando, GlueX-doc-747 on the GlueX-doc-747
  • Hall D Complex Final Drawings (25 Feb 2008) - From landscaping to electrical details Hall D Complex
  • Hall D Space Program Design Criteria (July 2007) - Additional construction details Hall D Complex II

Electronics Subsystems

  • Detector Electronics
 > ASIC
 > Preamp Card
 > STBs, HVTBs, HVBs
  • Signal Integrity
 > Signal Cables
 > Connectors
 > Splitters
  • Modular Electronics
 > Discriminators (LE, CFD)
 > Scalers
  • Readout Electronics
 > F1TDC
 > fADC125
 > fADC250
  • L1 Trigger Electronics
 > SD - Signal Distribution
 > CTP - Crate Trigger Processor
 > TI - Trigger Interface
 > SSP - Sub-System Processor
 > GTP - Global Trigger Processor
  • Environmental Monitoring
 > Temperature
 > Humidity
 > Cooling Systems
  • Power Systems & Controls
 > AC
 > High Voltage
 > Low Voltage
 > Distribution
  • Cable Systems
 > HV
 > LV
 > Controls
 > Interfaces
  • Grounding
 > Safety
 > Reference
 > Hall
  • Safety
 > Standards & Guidelines
 > Monitoring
 > Interlocks