DC and PID Review

From GlueXWiki
Revision as of 17:01, 12 March 2008 by Barbosa (Talk | contribs)

Jump to: navigation, search

Preparations for the Hall D DC and PID Final Design and Safety Review
Review: Mar 27 and 28

  1. Previous Reviews
  2. Mar 27-28 Review Documents (halld guest)
  3. Pre-brief Material. Due Mar 19 to reviewers.
  4. First round of dry runs (week of March 10)
    1. Monday L102/104 Mar 10
    2. Tuesday F326/327 Mar 11
    3. Wednesday Mar 12
    4. Thursday F326/327 Mar 13
      • Talk 2 9:00 am Yves
      • Talk 6 4:30 pm Elton
    5. Friday F326/327 Mar 14
      • Talk 7 8:00 am Eugene
      • Talk 1 10:00 am Curtis
  5. Second round of dry runs (week of Mar 17)
    1. Monday F326/327 Mar 17
      • Talk 15 3:30pm Fernando
    2. Tuesday F326/327 Mar 18
    3. Wednesday Mar 19
    4. Thursday F326/327 Mar 20
      • Talk 2 9:00 am Yves
      • Talk 6 4:30 pm Elton
    5. Friday F326/327 Mar 14
      • Talk 7 8:00 am Eugene
      • Talk 1 10:00 am Curtis
  6. Final talks to Elke:Tue Mar 25
  7. Review: Mar 27 and 28
  8. issues that need special attention