Difference between revisions of "Controls Meeting 6-Mar-2014"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 3: Line 3:
 
* Announcements
 
* Announcements
 
* Minutes from previous meeting [[Controls Meeting 6-Feb-2014]]
 
* Minutes from previous meeting [[Controls Meeting 6-Feb-2014]]
* UPS requirements for solenoid (Dave, Yi)
+
* UPS requirements for solenoid controls (Dave, Yi)
 
* FCAL Pulser using V1495 (Orlando)
 
* FCAL Pulser using V1495 (Orlando)
 
* FDC power supply interlock status (Hovanes, Dave)
 
* FDC power supply interlock status (Hovanes, Dave)

Revision as of 21:48, 4 March 2014

Agenda

  • Announcements
  • Minutes from previous meeting Controls Meeting 6-Feb-2014
  • UPS requirements for solenoid controls (Dave, Yi)
  • FCAL Pulser using V1495 (Orlando)
  • FDC power supply interlock status (Hovanes, Dave)


Time/Location

9:30AM Thurs 6-Mar-2014 CC A110