Difference between revisions of "Controls Meeting 4-Sep-2014"

From GlueXWiki
Jump to: navigation, search
(Created page with "* Announcements * FDC chiller interlock (Hovanes) * TAC and collimator motor (Hovanes) * Remote reset of CAEN HVs (Werth) * Status of voltage controls (Nerses) * Any other busine...")
 
Line 1: Line 1:
 
* Announcements
 
* Announcements
 
* FDC chiller interlock (Hovanes)
 
* FDC chiller interlock (Hovanes)
* TAC and collimator motor (Hovanes)
+
* Remote reset of CAEN HV crates (Werth)
* Remote reset of CAEN HVs (Werth)
+
* Pair Spectrometer magnet power supply (Hovanes, Mark S.)
 
* Status of voltage controls (Nerses)
 
* Status of voltage controls (Nerses)
 
* Any other business
 
* Any other business
** Solenoid  
+
** Solenoid GUIs
** LH2 Target
+
** Beamline motors
 +
 
  
 
==Time/Location==
 
==Time/Location==
  
9:30AM Thurs 21-August-2014 CC A110
+
9:30AM Thurs 4-Septembert-2014 CC A110

Revision as of 09:59, 3 September 2014

  • Announcements
  • FDC chiller interlock (Hovanes)
  • Remote reset of CAEN HV crates (Werth)
  • Pair Spectrometer magnet power supply (Hovanes, Mark S.)
  • Status of voltage controls (Nerses)
  • Any other business
    • Solenoid GUIs
    • Beamline motors


Time/Location

9:30AM Thurs 4-Septembert-2014 CC A110