Present:  Elliott W, Josh B, Mark S.
 +
 +
 +
 +
'''UPS and Summer Student'''
 +
 +
Rob Ryan, a CNU summer student, is looking into how to communicate with the Liebert UPS.  Possibilities include SNMP, hard-wired relays.  We may need to purchase "Intellislot" cards for both, Walt is checking whether we ordered any.  Both EPICS and AFECS can communicate via SNMP, and the PLC can sense relays.  We may want to implement hardware and software communication with the UPS for redundancy, particularly if the UPS will power critical systems in the hall.
 +
 +
 +
 +
'''JInventory System and Barcode Scanner'''
 +
 +
Elliott added new columns as requested at previous meetings.  Elliott and Hovanes will meet with a barcode scanner salesman right after lunch, stay tuned...
 +
 +
 +
 +
'''Counting House'''
 +
 +
Mark will find out why there's been no progress on installing the RDC and try to get it moving again.
 +
 +
 +
 +
'''Solenoid'''
 +
 +
Elliott has been tasked with creating a full FastTrack schedule for the Nov test (despite his best efforts to pawn it off on someone else).
 +
 +
 +
 +
'''PLC Programming'''
 +
 +
Josh has been busy modifying and rewriting the existing PLC program.  He is making great use of structured text and add-on instructions.  Partly as a training exercise, and partly because it will be useful, He will have Dave Butler rewrite the Danfysik communication code (all ladders now, change to a mostly structured text).
 +
 +
 +
 +
'''ELog'''
 +
 +
Accelerator will demo their first attempt at a major upgrade soon.  The upgrade is based on requests from the four halls.

Revision as of 09:27, 1 June 2012

Agenda

  • Announcements
  • Minutes from previous meeting 17-May-2012
  • CNU summer student projects - Elliott
    • Liebert UPS control, SNMP, AFECS/EPICS, etc.
  • Barcode scanner - Elliott, Hovanes
  • EPICS - Hovanes, Vanik
    • alarm system, goniometer, UConn boards, other power supplies, etc.
  • Counting house installation - Hovanes, Mark
  • Solenoid_Controls_Redesign - Mark, Josh, Scot, Yi, Elliott
    • FastTrack, FMEA, UPS power to Danfysik, SOE, QD, overcurrent protection, ground fault detector, etc.
  • JInventory database - Elliott
    • new columns: MAC_Address, IPName, GeomLoc
  • Test stand - Hovanes, Josh
  • PLC programming and PXI system - Josh, Dave
  • Elogs and databases - Elliott
  • Mantis task tracker
  • Experiment Control Supervisor - Elliott


Time/Location

9:30 AM Thurs 31-May-2012 CC L207


Announcements

Next Meeting

9:30am Thurs 14-May-2012 CC L207


Minutes

Present: Elliott W, Josh B, Mark S.


UPS and Summer Student

Rob Ryan, a CNU summer student, is looking into how to communicate with the Liebert UPS. Possibilities include SNMP, hard-wired relays. We may need to purchase "Intellislot" cards for both, Walt is checking whether we ordered any. Both EPICS and AFECS can communicate via SNMP, and the PLC can sense relays. We may want to implement hardware and software communication with the UPS for redundancy, particularly if the UPS will power critical systems in the hall.


JInventory System and Barcode Scanner

Elliott added new columns as requested at previous meetings. Elliott and Hovanes will meet with a barcode scanner salesman right after lunch, stay tuned...


Counting House

Mark will find out why there's been no progress on installing the RDC and try to get it moving again.


Solenoid

Elliott has been tasked with creating a full FastTrack schedule for the Nov test (despite his best efforts to pawn it off on someone else).


PLC Programming

Josh has been busy modifying and rewriting the existing PLC program. He is making great use of structured text and add-on instructions. Partly as a training exercise, and partly because it will be useful, He will have Dave Butler rewrite the Danfysik communication code (all ladders now, change to a mostly structured text).


ELog

Accelerator will demo their first attempt at a major upgrade soon. The upgrade is based on requests from the four halls.