** CAEN HV crates  (Almost Done)
 
** CAEN HV crates  (Almost Done)
 
** PDU called u1-10-pdu for the Wiener MPOD u1-10-top crate (Done)
 
** PDU called u1-10-pdu for the Wiener MPOD u1-10-top crate (Done)
 +
**: Issues with username/password?
 
* New ComCal chiller controls
 
* New ComCal chiller controls
 
* MyaViewer retirement (Hovanes)
 
* MyaViewer retirement (Hovanes)

Revision as of 15:32, 29 May 2019

  • Announcements
  • Solenoid status (Tim,Beni)
    • New alarms
  • Remote resets (Hovanes, Nick)
    • Three VME crates used by OPS for our controls (Done)
    • CAEN HV crates (Almost Done)
    • PDU called u1-10-pdu for the Wiener MPOD u1-10-top crate (Done)
      Issues with username/password?
  • New ComCal chiller controls
  • MyaViewer retirement (Hovanes)
  • Test setup for power crates (Nick)
  • TOF upgrades
  • DIRC installations
  • Other business
    Possible upgrades to RHEL7 in August.

Time/Location

10:00AM Thursday 30-May-2019 CC B101