Difference between revisions of "Controls Meeting 30-May-2019"

From GlueXWiki
Jump to: navigation, search
(Created page with "* Announcements * Solenoid status (Tim,Beni) ** New alarms * Remote resets (Hovanes, Nick) ** Three VME crates used by OPS for our controls (Done) ** CAEN HV crates (Almost D...")
 
Line 7: Line 7:
 
** PDU called u1-10-pdu for the Wiener MPOD u1-10-top crate (Done)
 
** PDU called u1-10-pdu for the Wiener MPOD u1-10-top crate (Done)
 
* New ComCal chiller controls
 
* New ComCal chiller controls
 +
* MyaViewer retirement (Hovanes)
 
* Test setup for power crates (Nick)
 
* Test setup for power crates (Nick)
 
* TOF upgrades
 
* TOF upgrades
 
* DIRC installations  
 
* DIRC installations  
 
* Other business
 
* Other business
 +
*: Possible upgrades to RHEL7 in August.
  
 
==Time/Location==
 
==Time/Location==
  
 
10:00AM Thursday  30-May-2019 CC B101
 
10:00AM Thursday  30-May-2019 CC B101

Revision as of 10:20, 29 May 2019

  • Announcements
  • Solenoid status (Tim,Beni)
    • New alarms
  • Remote resets (Hovanes, Nick)
    • Three VME crates used by OPS for our controls (Done)
    • CAEN HV crates (Almost Done)
    • PDU called u1-10-pdu for the Wiener MPOD u1-10-top crate (Done)
  • New ComCal chiller controls
  • MyaViewer retirement (Hovanes)
  • Test setup for power crates (Nick)
  • TOF upgrades
  • DIRC installations
  • Other business
    Possible upgrades to RHEL7 in August.

Time/Location

10:00AM Thursday 30-May-2019 CC B101