Difference between revisions of "Controls Meeting 3-Apr-2014"

From GlueXWiki
Jump to: navigation, search
Line 5: Line 5:
 
* [[media:BCALPulser_GUI_presentation.pdf | BCAL pulser control (Orlando)]]
 
* [[media:BCALPulser_GUI_presentation.pdf | BCAL pulser control (Orlando)]]
 
* [[Alarms for voltages (Nerses)]]
 
* [[Alarms for voltages (Nerses)]]
* Status of BCAL interlocks (Dave)
+
* [[File:BCAL_Interlock.pptx ]] | Status of BCAL interlocks (Dave)
 
* Radiator insertion stage test (Hovanes, Yi)
 
* Radiator insertion stage test (Hovanes, Yi)
 
* Status of the cabling of the motorized stages (Scot)
 
* Status of the cabling of the motorized stages (Scot)

Revision as of 08:58, 3 April 2014

Agenda


Time/Location

9:30AM Thurs 3-Apr-2014 CC A110